The ONGOING Massive Construction of the 18.75km 6-lane rigid pavement from Eleko to Epe T junction by Messers Craneburg Construction. Governor of Lagos State, Mr @jidesanwoolu flagged off the construction on 1st November 2020.
#SanwoReports
@LASGWorks @gbenga_omo @ramadeyo
Project Details:
⁃The Total Length of the road from Eleko Junction to Epe T junction is 18.75km.
⁃CONTRACTOR: Craneburg Construction
⁃Provision of reinforced concrete drains, Culverts and Median Barrier
@gboyegaakosile @followlasg @positivebaqi @HonNoheem
⁃Installation of Traffic Lights
⁃Landscaping of Road Verges
⁃Preservation of rail line corridor with 50m RoW
⁃Installation of Street Lights
⁃Dedicated Truck Lane and Railway Line (for future).
@jidesanwoolu @gbenga_omo @Riddwane @FunkeTega @positivebaqi
This Road will serve as template for construction of road leading towards the Dangote Refinery, Lekki Ports and the Lagos Free Zones, this will save us from having a future “Apapa” kind of problem.
Futuristic thinker @jidesanwoolu 💥
#SanwoReports
The second phase (when awarded) will now be from Eleko Junction all the way back to Abraham Adesanya with a 26.7km stretch. Governor @jidesanwoolu promised this project, flagged it off and delivering quality infrastructure to the Lagos East axis of the State.
#SanwoReports
Share this Scrolly Tale with your friends.
A Scrolly Tale is a new way to read Twitter threads with a more visually immersive experience.
Discover more beautiful Scrolly Tales like this.