Jubril A. Gawat Profile picture
Senior Special Assistant on New Media to Governor @jidesanwoolu | Active Citizen (Online & Offline).. | LAGOS Blood| Oko Aisha ❤️|

May 11, 2021, 5 tweets

The ONGOING Massive Construction of the 18.75km 6-lane rigid pavement from Eleko to Epe T junction by Messers Craneburg Construction. Governor of Lagos State, Mr @jidesanwoolu flagged off the construction on 1st November 2020.

#SanwoReports

@LASGWorks @gbenga_omo @ramadeyo

Project Details:

⁃The Total Length of the road from Eleko Junction to Epe T junction is 18.75km.

⁃CONTRACTOR: Craneburg Construction

⁃Provision of reinforced concrete drains, Culverts and Median Barrier

@gboyegaakosile @followlasg @positivebaqi @HonNoheem

⁃Installation of Traffic Lights

⁃Landscaping of Road Verges

⁃Preservation of rail line corridor with 50m RoW

⁃Installation of Street Lights

⁃Dedicated Truck Lane and Railway Line (for future).

@jidesanwoolu @gbenga_omo @Riddwane @FunkeTega @positivebaqi

This Road will serve as template for construction of road leading towards the Dangote Refinery, Lekki Ports and the Lagos Free Zones, this will save us from having a future “Apapa” kind of problem.

Futuristic thinker @jidesanwoolu 💥

#SanwoReports

The second phase (when awarded) will now be from Eleko Junction all the way back to Abraham Adesanya with a 26.7km stretch. Governor @jidesanwoolu promised this project, flagged it off and delivering quality infrastructure to the Lagos East axis of the State.

#SanwoReports

Share this Scrolly Tale with your friends.

A Scrolly Tale is a new way to read Twitter threads with a more visually immersive experience.
Discover more beautiful Scrolly Tales like this.

Keep scrolling