ArundelsOfNorfolk Profile picture
Mar 13 26 tweets 20 min read
More wonderfully wide cycleways with locked gates and poorly signed diversions at @iceshef
The following is a journey along a peculiar cycleway, starting amongst industrial estates, connecting to the heart of the lower Don Valley. It's largely unsigned so I will refer to it as the Attercliffe Cycleway.
Starting on a wide bridge, suitable for future extension to the NCN 627.

Woodbourn Rd
maps.app.goo.gl/6pvzZ1VsgKvK6e…

It seems to have been built by the Sheffield Development Corporation, who worked to regenerate the lower Don Valley
@SheffHistory @sheffield_hods
Any ideas?
Starts off great, wide with people and bikes apart. Keeping everyone safely away from the tram lines.

However, as ever, crossing at traffic lights are missing proper crossings. Easily added
Then it kind of gives up. I suspect Amey has resurfaced it out of existence on the opposite pavement.

Then back to nice wide cycleway.

No directional signage to seen so far
Proper crossing but cycle symbol missing leading to confusion. Still no directional signage but there is a hidden cycle symbol on the side road, leading to the rest of the Attercliffe cycleway
Poor surfaced, unsigned leading towards the canal
Nice wide route over the canal, and another active traveller merrily making waves along the water
After Attercliffe tram stop, very high quality, kerb separated, lit and wide cycleway!
A #lowtrafficneighbourhood, with filtered streets, connected by cycleways. however, the lack of signage means its easy to get lost
The route is then slightly broken by the @OLPSheffield but should be fixed by Connecting Sheffield
The route downgrades to shared paths and once again lacks signage.

Once you reach @ice_sheffield the gates are locked cycleway
One of the stranger elements, another path to nowhere, as the cycleway bridge was ripped out when the Don Valley Bowl was demolished
More wonderfully wide cycleways with locked gates and poorly signed diversions at @ice_sheffield
Press go too early!
Part 2!

Alongside @SheffieldArena , the cycleway becomes part of the National Cycle Network & @TPT_National

Finally good signage!
Minimally cycle parking and substandard crossings over the car park roads of @SheffieldArena
Proper crossings and wide well signed route across centretainment
Inevitably becomes overgrown although @sccstreetsahead have been out recently
And with more overgrowth, it fizzles out onto an industrial estate but quietly links up with the @theblueloop and 5 Weirs walk
A summary:
a route designed to link up some major employment areas but is hard to find and stay on
- some very good, wide sections, kept apart from walkers
- signage is either excellent or none existent

However, a bright future ahead.....
Connecting Sheffield will thread a high quality route across it, making it useful and safe to use again.

Improvements needed but the spine linking employment & leisure is there.

There will also be hundreds of new homes at Attercliffe Waterside

Thanks for reading my ramblings!
@SheffHistory @sheffield_hods @cllrpeteprice Do you know much about these cycle paths and who put them all in?
Was it the development corporation?
@OLPSheffield @PeteZanzottera @DameSarahStorey You can just about spot the old cycleway before it was chopped up
Just look at what we lost 😱
@CycleSheffield

• • •

Missing some Tweet in this thread? You can try to force a refresh
 

Keep Current with ArundelsOfNorfolk

ArundelsOfNorfolk Profile picture

Stay in touch and get notified when new unrolls are available from this author!

Read all threads

This Thread may be Removed Anytime!

PDF

Twitter may remove this content at anytime! Save it as PDF for later use!

Try unrolling a thread yourself!

how to unroll video
  1. Follow @ThreadReaderApp to mention us!

  2. From a Twitter thread mention us with a keyword "unroll"
@threadreaderapp unroll

Practice here first or read more on our help page!

More from @ArundelsN

Mar 13
Please retweet and lodge an objection.

The developer was told by the council, if this site is ever brought back into use, land must be safe guarded for a future cycle way. Now it is to be car parking.
Object here:
tinyurl.com/2nmcyspr

More info
cyclesheffield.org.uk/2022/03/13/obj…
@CycleSheffield @UpperDonTrail Objections can also been emailed to Joanna.Atherton@sheffield.gov.uk quoting 21/05085/FUL.

Please ask for the plans to be changed, reducing car parking & to safe guard the Penistone road cycleway.
Read 4 tweets

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3/month or $30/year) and get exclusive features!

Become Premium

Don't want to be a Premium member but still want to support us?

Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal

Or Donate anonymously using crypto!

Ethereum

0xfe58350B80634f60Fa6Dc149a72b4DFbc17D341E copy

Bitcoin

3ATGMxNzCUFzxpMCHL5sWSt4DVtS8UqXpi copy

Thank you for your support!

Follow Us on Twitter!

:(