Gareth Dennis Profile picture
Sep 17 22 tweets 10 min read
Let's talk about this #Gadgetbahn: the Padova t̶r̶a̶m̶ guided bus.
Firstly, let's get the important question out of the way... What is it?

If the branding of the system is to be believed, it's a tram. Spoiler alert: it isn't.
Because a glance under the sideskirts and at the roadway reveals that the branding is fibbing: the vehicles are supported on rubber tyres, and the single steel rail only acts as a guideway.
This means: it's a bus, as confirmed by the #NotAMetro sorter.
But if it looks like a tram, many of you might think: so what if it has rubber tyres?

The system is certainly popular with locals...
It has well-built stations that enable level boarding, and (as @Kevin_D_Tennent and I will talk about in a future #RailNatter) it provides the psychological benefits of a permanent way that trams do but buses don't.
BUT there are fundamental issues that get to the heart of why specification *is* important, and all of these relate to the lack of steel on steel.

The big one: capacity. Run any more frequent a service and the infrastructure, even when reinforced as in Padova, crumbles to bits.
The mass of the vehicles is conveyed on the wheels. And the guideway means that the wheels are in pretty much precisely the same place on the road for every vehicle passage.

That limits the number of services to no more than about ten an hour for a fairly short vehicle.
In Padova, even with the addition of a reinforced roadway, the current frequency (8.6 services an hour) is breaking up the road surface and requires regular, costly repairs.

Limited frequency means limited capacity. No more than 2000pphpd, which a reasonable bus service can do.
(System capacity is measured in pphpd, which stands for "passengers per hour per direction" - THE critical measure of the effectiveness of any passenger transport system.)
The consequence of the extra reinforcement is that the cost of the Padova Translohr installation ended up being around €105M in 2022 prices.

The cost of the tram project that Translohr purported to be cheaper than to win the contract? €105M in 2022 prices.
Given that this system has every other feature that a tram has, including OLE, the only ostensible benefit is in saving the cost of laying one extra rail which, in every case, has been shown not to be a saving at all.

So capacity is sacrificed, but what else?
Let's talk energy efficiency.

Rubber wheels means about 10x the rolling resistance of steel on steel. This means that, though it uses about the same energy to accelerate (50Wh per pax), it requires 10x as much to cruise (100Wh vs 10Wh per pax for trams).
Sadly, nobody has published a direct comparison of energy efficiencies, but the above numbers should make clear: it isn't better.
How about ride quality?

It's no better than a regular bus. Very much NOT smooth.
Safety? Operators have suggested that the Translohr guideway system has a tendency to cause derailments by its inherent design. Before the formal service started, five derailments took place on the Padova system.
My last point, and a big reason I push back on this stuff: Translohr and the GLT system are proprietary.

If you want to repair or expand the system, you're locked into a single supplier. They can charge what they like and if they cease operation, you're stuck.
Regular trams? You can get anyone to lay the tracks. You can buy trams from anyone. You don't need to hoard spares for a dying technology to keep people moving in your city.
(Translohr and the Bombardier Guided Light Transit or GLT (both now owned by Alstom) are the only technologies of this type in operation outside of China.)
Another consequence of this is that it delays the expansion of systems - only one supplier means a slower pipeline of work. Translohr's failings have also delayed expansion in Padova - where other systems have been ripped up, Padova are sticking with it 😔
My conclusion to all this? ALWAYS ask what problem a proprietary system is solving.

When you (eventually) get a response, be it from Translohr or Tesla or the @BoringCompany or @HyperloopTT or whoever, interrogate their numbers (in most cases, they won't have any).
At which point: 🚮

This is the rule of thumb: in essentially all cases, we've solved transport technology. We need to get on and build more of what we know.

So if someone's pitching something new, treat them with extreme suspicion.

• • •

Missing some Tweet in this thread? You can try to force a refresh
 

Keep Current with Gareth Dennis

Gareth Dennis Profile picture

Stay in touch and get notified when new unrolls are available from this author!

Read all threads

This Thread may be Removed Anytime!

PDF

Twitter may remove this content at anytime! Save it as PDF for later use!

Try unrolling a thread yourself!

how to unroll video
  1. Follow @ThreadReaderApp to mention us!

  2. From a Twitter thread mention us with a keyword "unroll"
@threadreaderapp unroll

Practice here first or read more on our help page!

More from @GarethDennis

Sep 16
I seem to be seeing a lot of these ex-@EddieStobartCom (?) boxes at the moment... Plus these wagons are German, so these will have done a long trip at some point.

Also: retrofitted side-loading ISO boxes? Clever if so!
From the top...
Never let anyone tell you the railway isn't green, etc... ImageImage
Read 6 tweets
Nov 18, 2021
Well, the #IntegratedRailPlan (a.k.a. #RailBetrayal) has landed. And immediately we can see that their plans are just a re-announcement of things that have already been planned (or indeed cancelled):
Actually, the proposals precisely mimic the NIC's Rail Needs Assessment from last year, despite government decrying it loudly after its publication.

If you want to understand why those plans were bad, I wrote about it in reasonable detail: #RailBetrayal
garethdennis.medium.com/the-nic-have-f…
Good god. You know what? It isn't possible for me to thread this document as I'd planned to as it is genuine top-to-bottom bullshit. #RailBetrayal

This paragraph, for example, is completely untrue. How on earth did the HS2 plans prevent electrification? This is fiction!
Read 25 tweets
Nov 18, 2021
I've no doubt I'm going to be popping up all day talking about the government's awful #RailBetrayal - but here's a warm up in the @Independent: independent.co.uk/news/uk/politi…
My key #RailBetrayal line:
“Running faster trains on the existing network will actually result in a railway that can carry fewer passengers and less freight than it can today.”
I popped up at around 06:05 this morning on @BBC5Live if you want to hear the exasperation in my voice at the government's unbelievably cynical pronouncements on their "glorious plan".
Read 34 tweets
Nov 17, 2021
As pointed out by @JenWilliamsMEN and others, there is a lot of confusion in the midst of this week's #RailBetrayal news over what the various legs and phases of HS2 and NPR actually refer to...

So, I created a map (click to pause):
The white lines are the existing network, in case you hadn't worked it out...

It becomes pretty obvious why the Eastern Leg is so crucial when you see the map above, but if you want another animated map then this explains things clearly:
Want a static version of the map in high-res? Be my guest (note that some of the HS2/NPR stations have been omitted for clarity):
Read 7 tweets
Nov 15, 2021
If you enjoyed tonight's wonderful series finale of #TheArchitectureTheRailwaysBuilt🧣 then remember you can catch @MrTimDunn and I on last week's #RailNatter taking a cheeky behind-the-scenes look at the hit @YesterdayTweets show!
Oh, and if you want to see Tim and I exploring inside the old Curzon Street station principal building as well as a plod around inside the roundhouse (courtesy of @HS2ltd), then you can watch this old thing:
Plus make sure your fingers are crossed for Series 4 of #TheArchitectureTheRailwaysBuilt!!! 🤞🤞🤞
Read 4 tweets
Sep 5, 2021
The last leg! Paris to York! 😭

(terrible PTI of course, as with all high speed European trains)
So little left of our 4000km epic from south east to north west Europe...
Well, this is true... I'm already getting giddy about passing through it, as I always do.
Read 32 tweets

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3/month or $30/year) and get exclusive features!

Become Premium

Don't want to be a Premium member but still want to support us?

Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal

Or Donate anonymously using crypto!

Ethereum

0xfe58350B80634f60Fa6Dc149a72b4DFbc17D341E copy

Bitcoin

3ATGMxNzCUFzxpMCHL5sWSt4DVtS8UqXpi copy

Thank you for your support!

Follow Us on Twitter!

:(