When I was taking the Shenzhen Metro at night, at Futian looking across the platform, I noticed some large boxes around the business class car of the opposing train. I stepped out to take a look and saw Shenzhen Metro is piloting delivering express parcels. A 🧵of what I saw.
Looking around the platform there are a lot of decals denoting a corridor for the freight (transported in dollies) to traverse the platform to the train from the elevator
The dollies are a frame with hooks that can hold two soft bags stacked on top of eachother filled with goods, probably electronics you ordered on Aliexpress from Huaqiangbei, the world's largest electronics market.
When I head to the concourse where the goods are coming down by elevator and I see the goods are delivered by autonomous minitrucks. The minitrucks unload the dollies, the dollies pass through the crash gate into the fare-paid areas of the station...
...and down to the platform using station elevators which in major Chinese metro stations usually had redundant elevators.
Outside the fare paid area I see a line of autonomous minitrucks waiting to be unloaded. The autonomous minitrucks cut things close! one almost hit me as it blasted pass me.
The autonomous minitrucks just drive (autonomously) around non-fare paid area of the station shuttling goods from a sorting facility in the adjacent underground mall to the aforementioned crash gate.
Following the autonomous minitrucks I found the sorting facility in the underground mall. Where the autonomous minitrucks parked up and awaited loading.
You can see how the autonomous minitrucks load and transport the dollies: they were picking them up, rotating then 90 degrees to laying them flat.
The autonomous minitrucks are dispatched back to the metro entrance crash gate, where the dollies are unloaded and brought down to Shenzhen Metro Line 11 and the cycle repeats.
And then the autonomous minitrucks go back to pick up more goods.
Looking on the internet I see that this is a pilot started in Aug 2023 between SF Express and Shenzhen Metro to shuttle packages and mail from their major Futian collection hub to their freight terminal at Shenzhen Bao'an International Airport via Shenzhen Metro Line 11.
2023 saw an explosion of pilot projects to get metro systems to deliver some time sensitive freight during off peak periods. With pilots being held in Beijing, Shanghai, Wuxi and Shenzhen Metros by China Post and SF Express.
We shall see how successful these turn out to be and what dedicated infra is required to scale this up. Regardless, thanks for reading this thread: Like, Share and Subscribe for more cutting edge transport news and experiences. Slap that bell for future notifications.
• • •
Missing some Tweet in this thread? You can try to
force a refresh
Japan's Ministry of Land, Infrastructure, Transport and Tourism has revised its 20 year old train crowding metrics which were surprisingly vibes based using qualitative newspaper and magazine based metrics. A🧵🧵(Old standard below)....
....I have noted my observations on Japan's crowding standards in an old thread but overall Japan has surprisingly loose (low) standards for a full train. You can still walk around with ease on a "full" Japanese train.
The old standard is as follows:
100%- Train @ capacity (all seats, straphangers, and handholds near the door taken)
150%- You can easily open and read a newspaper
180%- You can read a folded newspaper
200%- There is a lot of physical contact, but you can still read a magazine...
Xiamen Metro Line 4 Phase 1 construction progress. Line 4 is Xiamen's first fully automated express line with GoA4 6 car Type B trains running up to 120kph. It is Xiamen's orbital line forming an arc around Xiamen Island (city center) and connecting...
...to Xiamen's new airport, reclaimed from the sea, to Xiamen North...
...Xiamen's Main High Speed Railway Station which I visited a few weeks ago. Line 4 runs elevated beside the Shenzhen-Xiamen Railway along some of it's northern route.
When I was in Shenzhen last week I passed by some construction sites of Shenzhen Metro Line 11 East extension, plunging Line 11 deep into the heart of Shenzhen. A little thread on what I saw...
A lot of Line 11 had to be squeezed down the middle of a road (Fuhua Road) with some special trackwork, leading to Line 11 having long and skinny cut and cover station, switch and crossover sections. So Shenzhen Metro just closed this section of road to thru traffic.
But local road traffic and pedestrian flow is maintained on Fuhua Road as shown with in the BIM maps of the two cut and cover sites.
When I was in Luoyang, I was surprised that they had a metro system; being Luoyang is a "smaller" Chinese city. (there are maybe ~3.5 million people). A little🧵of one thing I noticed about it
The Luoyang Metro is a system of 2 lines totaling 43.5 km in length. The entire 2 line Phase 1 system opened in 2021. Making it only 3 years old, or in technical terms, a young buck. It covers a lot of what you want to see in the city: new and looks old but new. However, as a...
...tourist I was a bit disappointed it didn't reach nearby major destinations. My trip to the Longmen Grottos, which date from the fall of the W Roman Empire, I was surprised how close it is to the city, and by extension, the Metro Station.
Last year the Yangtze carried over 3.8 billion tons of freight, up 8% over 2022. This is the traffic volume of 5 Mississippi or 12 Rhine waterway systems and a larger freight volume than all inland waterway systems in the world outside of China combined.
In an annual inland shipping forum held in Chongqing this June, delegates the from 5 provinces, major shipping and industrial conglomerates complained about the huge volume and growth of freight on the Yangtze has put huge strain on infrastructure and created bottlenecks.
In 2017 the government tried to increase capacity by dredging key bottlenecks on the Yangtze to support 6 meter draft. Allowing 13,000 ton ships to reach Wuhan, almost 1,000km upstream from Shanghai. A 13,000 ton river container ship like Hanhai 5 below can carry over 1,100 TEUs.
Last week Dongguan released it's Phase II metro adjustment plan. The theme? Metro connections to neighbouring Guangzhou and Shenzhen Metros. 6 extension lines and 27 km of additional metro is proposed. What's more interesting is...
...the official allocated budget changes due to alignment adjustments of existing under construction projects:
L1 Phase 1: 57.5km long (no change), 30 km of elevated running is reduced to 8 km.
L3 Phase 1: 51.3km long (no change), all 17 km of elevated running put underground...
The extra tunnelling for L1 Phase 1 requires an additional 1.9 billion INT$ in construction costs but only a increase of 900 million INT$ in overall costs. Below maps I can find online show the changes. Left is old plan with elevated in red, right is new plan elevated in blue...