@balfourbeatty @Edinburgh_CC The 6 months project at Melville Street/Walker Street has totally flooded as Balfour Beaty blocked all the drains with works rubble and didn’t clear them. Basement flats now being threatened by flood water. Please come as an emergency!
• • •
Missing some Tweet in this thread? You can try to
force a refresh