Discover and read the best of Twitter Threads about #HTTYD

Most recents (1)

I may reupload this at a later date, as I havent included all retention ponds (same capacity just moved). but here is what I would do to build out the #EpicUniverse South Campus with City Walk 2.0 and a 4th Gate, parking garage too. I have even drawn in the ring road. Image
Point is, it's fully connected to the BOH area with the ring road, and universal way if needed. Parking garages over the road replace the lot, similar parking capacity to North Campus, and City Walk 2.0 sits in between both parks #EpicUniverse and the new park is bigger than IOA Image
In case it needs reiterating:the drainage plan was for 90% buildout of the entire 550 acre project site. so as long as they have the same pond capacity they can move them anywhere. They wouldnt have planned enough ponds for 90% buildout if they only ever intended to develop half
Read 30 tweets

Related hashtags

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3.00/month or $30.00/year) and get exclusive features!

Become Premium

Too expensive? Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal Become our Patreon

Thank you for your support!