Discover and read the best of Twitter Threads about #onedaydesignsprint

Most recents (1)

One Day Design Sprint. Morning 8 am Start. Just one USP User Flow. Virtual Projection everything on Apple Watch size screen. Limited Space, limited IA, limited ID & linear task flow. 2 PM Usability Testing. 4 PM improvisation on data collected. 6 PM wrapup. @AJSmartDesign
I was following Design Sprint of @AJSmartDesign that is 4 days long. Then it strike me that does Screen Size (apple watch, phone, tablet, Desktop, TV, Projector) proportional to the Design Sprint's duration (week)?
A 4 day sprint will have multiple objective. A 1 day sprint will have USP objective cutting out all the noise. A 1 day sprint means failing at the end of the day if the USP can't be discovered or usability testing don't get the expected output. Much better than failing on the
Read 9 tweets

Related hashtags

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3.00/month or $30.00/year) and get exclusive features!

Become Premium

Too expensive? Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal Become our Patreon

Thank you for your support!