Discover and read the best of Twitter Threads about #smartsappers

Most recents (1)

#VE75. Looking at the RE railway contribution to the long road to VE Day. The first problem to delivering railways post D Day was the landing of rolling stock on the beaches. Solution was to fit special ramps to landing craft and install rail on the beaches. ImageImageImageImage
Loading trial by RE troops in a Landing Ship Tank prior to D-Day.
#VE75 #smartsappers #proudsappers
@RE_Hist_Society Image
Beachead logistics dictated rail stores could be no longer than 20ft and up to 1 tonne until D +15. In total 5000ft of bridging, 60 miles of track and 200 turnouts would be brought over the beacheads and Mulberry. The rail was mostly 75lb FB and standard 1 in 8 crossings.
Read 4 tweets

Related hashtags

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3.00/month or $30.00/year) and get exclusive features!

Become Premium

Too expensive? Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal Become our Patreon

Thank you for your support!