#Whitefield Metro Depot: •Foundation pit and Diaphragm wall construction on either sides of Dinnur Road
•Large number of workmen from VASCON and ITD CEM are seen at work.
•Lot of activity happening at Whitefield Depot
•05/10/20
@TheMetroRailGuy @ChristinMP_TOI @Lolita_TNIE
These three pics are to the extreme end of Whitefield Metro Depot.
West most part of the depot from Dinnur Road.
#Whitefield #MetroDepot
•To the West end of Dinnur road, First concrete block (pic1) getting lifted up on the compound wall
•Lot many new concrete structures shaping up
•Utility ducts and other diaphragm wall works going on too
#Bangalore
@TheMetroRailGuy
Adding pics from #WhitefieldMetroDepot from Nov’20 to the main thread.
#Whitefield #MetroDepot #Bangalore
•The west most part of the depot (literally the end point of entire area) has got its #Firstbuilding
•compound wall on one side is almost done
•Not a single 🌲 has been 🪓 yet
•Huge number of Pillars (pics 3&4) are seen. @TheMetroRailGuy
•All above pics and this one are from West of #Dinnur Road in Whitefield.
•Pillars from pics 3&4 (not sure what they are meant for) are in very large numbers on the other side of road too. Not all are seen here.
#WhitefieldMetroDepot
West side of Dinnur Road, this is the end point of the entire Depot. A building, sub station and electrical works are going on 👍
12-04-2021 @TheMetroRailGuy @WFRising @KARailway @ChristinMP_TOI @bengalurutrains @sandeeprrao1991
A section of the #Dinnur Road which connects to Kadugodi flyover from ITPL main road seems to be closed permanently(the regular route), there is a slight deviation which again connects to the same road. #WhitefieldMetroDepot passes by this section, hence the road is closed.
This is one of the longest threads. Covered #Whitefield #MetroDepot from all sides and even from middle of the ground.
Now these aerial shots will give a clear picture of all the lines that head to the depot.
Total #WhitefieldDepot can be seen in these pics @TheMetroRailGuy
Video of #WhitefieldMetroDepot
• Workshop Bay
•Repair & Inspection Bay
•Substation
•4 curvy tracks heading into Depot from Whitefield 🚉
……& the lovely greenery, that’s #KadugodiTreePark. I remember many asked for location, u can see it here clearly
@TheMetroRailGuy
Let’s see where we are with #PurpleLine’s September trial runs between #Whitefield and #Baiyappanahalli
You can notice the tracks, 🚉 work, Inspection, repair & workshop bays apart from a Substation. These pics are from Whitefield Depot & Kadugodi 🚉 26/07/22
@TheMetroRailGuy
Final set
#Bangalore #PurpleLine #Whitefield #Kadugodi #NammaMetro
That under construction building is #Sumadhura Capitol Hills
26/07/2022