🌉 List of cable stayed bridges coming up in #chennai as part of 20.5 km PORT-MADURAVOYAL elevated road
1. Maduravoyal clover leaf interchange
A suspension bridge with cloverleaf entry&exits above the existing one @ maduravoyal interchange making it a double level cloverleaf.
2. Location : Koyambedu
This cable stayed structure will zoom past & cross Koyambedu cooum river bridge near Vr mall, existing metro green line, upcoming elevated metro red line with two cable stayed spans
While these cable stayed bridges might not be massive in scale compared to ones in cities around the world.. the complexity in building them over existing structures is what would make it challenging and standout.
On the whole its going to be the flagship project of #CHENNAI
• • •
Missing some Tweet in this thread? You can try to
force a refresh