Nisanth P Profile picture
Civil Engineer🏗 Tweets related to ▫️Chennai▫️Real Estate ▫️Infrastructure ▫️ Transportation 🚇Exclusive updates on Chennai Metro PH-2🚇
Jul 16, 2022 4 tweets 5 min read
🌉 List of cable stayed bridges coming up in #chennai as part of 20.5 km PORT-MADURAVOYAL elevated road

1. Maduravoyal clover leaf interchange
A suspension bridge with cloverleaf entry&exits above the existing one @ maduravoyal interchange making it a double level cloverleaf. 2. Location : Koyambedu

This cable stayed structure will zoom past & cross Koyambedu cooum river bridge near Vr mall, existing metro green line, upcoming elevated metro red line with two cable stayed spans

@UpdatesChennai @updates_tn @TheVenks @VinTN @arulmuru182002