Happy New Year to all Mako Shareholders!

2024 ended w/ our 2nd accretive acquisition, expanding our production profile & establishing a pipeline for growth.

2025 will be about advancing the underground in 🇳🇮, the engineering and permitting in 🇬🇾, and the restart of mining operations in 🇺🇸, as well as additional accretive M&A

• • •

Missing some Tweet in this thread? You can try to force a refresh
 

Keep Current with Akiba Leisman

Akiba Leisman Profile picture

Stay in touch and get notified when new unrolls are available from this author!

Read all threads

This Thread may be Removed Anytime!

PDF

Twitter may remove this content at anytime! Save it as PDF for later use!

Try unrolling a thread yourself!

how to unroll video
  1. Follow @ThreadReaderApp to mention us!

  2. From a Twitter thread mention us with a keyword "unroll"
@threadreaderapp unroll

Practice here first or read more on our help page!

More from @AkibaLeisman

Jan 26
$mko.v

OK Sharkheads!

New Moss Resource Estimate Just Dropped!

~679,000 AuEq M&I ounces using a 194.6:1 Ag:Au equivalent factor
$mko.v

The numbers below … Image
$mko.v

In addition to new drilling +2021, we ALWAYS model on geology/lithology.

There is a major fault that cuts through the resource: the structurally controlled vein in the Monzonite is NOT the same thing as the stockwork in the Tuff.

GEOLOGY >> than any other factor. Image
Read 6 tweets
Dec 31, 2021
$mko.v

Happy New Year to all Mako shareholders.

We end 2021 with our plant at >500tpd.

The goals for 2022 are:

Resource at Las Conchitas so we can begin mining LC in late Q4.

DISCOVERY at one or more of our regional targets.

Rapid debt repayment.

Exciting year ahead!
$mko.v

You can see we’re into the graphitic part of the deposit, ~marking the transition between oxide and fresh rock.

We haven’t seen ANY diminution to recoveries. Biggest challenge is this material turns into little balls that gum up our stock tank, but easily manageable. Image
$mko.v

Think about how much #bitcoin these could buy! ImageImageImageImage
Read 174 tweets
Dec 30, 2021
$mko.v

Mako Mining Announces Drilling Permits for La Segoviana and Corporate Update makominingcorp.com/news/index.php…
$mko.v

We received drilling permits at La Segoviana (a few weeks ahead of schedule).

We also began the process of acquiring the most prospective areas of surface rights. I’ve mentioned this publicly before — I think Segoviana will be a mine w/in 3 years.
$mko.v

Cesar (VP Corp Dec) has also left the company to focus on his other endeavors — especially as Executive Chairman of $btr.v when Marc-Andre comes in as CEO in a few weeks.

We’re sorry to see him go.
Read 4 tweets
Dec 31, 2020
$mko.v

Happy New Year to all Mako shareholders.

We end 2020 with our mine ready to be turned on in the New Year.

The goals for 2021 are:

Commercial Production in Q2

Resource delineation drilling at Las Conchitas

1st ever regional drilling program

Exciting year ahead! Image
$mko.v

Mining back in action!

Still only mined 2.5 benches of HG as we focus on stripping at about 20% of full capacity (to save $ pre-prod).

First 2 benches > 0.5 Oz/t!

Last 1/2 bench was caught in the great fire assay backlog of 2020. Should get those back next week. Image
$mko.v

Footings for tailings press done — last major piece that needs to be installed

LOTS of piping & connections being welded inside

Based on grades of bench above, that bus is sitting on a very valuable parking lot! I’ll report the 1/2 bench next week (week after latest). ImageImageImage
Read 137 tweets
May 12, 2020
$mko.v 1/8 OK Sharkheads.

Today’s thread is about sampling and dilution (key risk #3 of my pinned tweet). I have real time mining pictures below.

Punchline is tolerances are tight and dilution has been ~10%.

But data coming from just 1 or 2 benches ain’t worth schist.
$mko.v 2/8 Recap of what we’re doing.

6-8m blast holes, taking 1-1.5m samples along the way. With BH data, open up 3m half mining benches. Geologist mark contact with FW/HW with blue paint. With excavator, remove the waste up to paint. Then remove “ore” to the FW contact.
$mko.v 3/8 Blast holes have 2 problems.

1. geology is not so kind to have straight 1m lines, so sample grades at contact point will be diluted.

2. RC and DH have good corr., but BH systematically underreport high grade (we have data to support this — prob. because of fines)
Read 8 tweets
Dec 31, 2019
$mko.v Happy New Year to all Mako shareholders.

We end 2019 with our infill drilling at San Albino complete, and the plant approximately 40% done.

The crusher has been delivered (top right of the photo).

Mill has been purchased and both mill & lab equip are en route Image
$mko.v you can see that construction and civil works are rapidly advancing at our San Albino mine. This picture from yesterday. Image
$mko.v from an hour ago. Laboratory is well on pace to be finished by early Feb. The final delivery for our crusher was made over the weekend. Image
Read 111 tweets

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3/month or $30/year) and get exclusive features!

Become Premium

Don't want to be a Premium member but still want to support us?

Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal

Or Donate anonymously using crypto!

Ethereum

0xfe58350B80634f60Fa6Dc149a72b4DFbc17D341E copy

Bitcoin

3ATGMxNzCUFzxpMCHL5sWSt4DVtS8UqXpi copy

Thank you for your support!

Follow Us!

:(