Ed Miliband’s Clean Power 2030 plan is officially off the rails. Soaring costs, missed wind & solar
targets, and now Drax walking away from BECCS. The promises of cheaper bills? Gone. A thread 🧵(1/12)
NESO and DESNZ claimed CP2030 could be delivered “without increasing costs for consumers” and would “bring down bills for good”. Reality: grid integration and generation cost are exploding. (2/12)
Grid balancing, transmission and Capacity Market costs are forecast to rise £17bn — from £8bn in 2024/25 to £25bn by 2030/31. That’s ~£600 extra per household. (3/12)
Generation costs are also higher than assumed. On a like-for-like basis, offshore wind strike
prices are 24% above CP2030 estimates, onshore wind 23% higher, and solar 6% higher. (4/12)
Offshore wind was meant to be the backbone — tripling to over 50GW by 2030.
Reality: just 0.7GW installed in 2025 vs 5.1GW needed every year. Already 8.4GW behind at
end-2025. (5/12)
On current trends, offshore wind will be 29.5GW short by 2030 in the aggressive scenario. Even
the milder scenario misses by 21.9GW. (6/12)
Onshore wind was supposed to almost double to 29GW. Only 0.7GW installed in 2024-25 vs
1.9GW needed annually. On track to be 6.9GW short by 2030. (7/12)
Solar was meant to triple to 48.5GW. Just 2.8GW installed in 2025 vs 4.6GW needed every year.
Already 3.7GW behind — heading for a 21GW shortfall by 2030. (8/12)
Now the killer blow: Drax has pulled the plug on BECCS, writing off £47.6m. They cite the
“current political environment and absence of an appropriate regulatory framework”. In other
words, the generous subsidies on offer are not enough to make the project viable (9/12)
CP2030 relied on BECCS for negative emissions. Without it, Miliband is short 3.4–6.9 MtCO₂ per
year. Emissions targets are now in serious trouble. (10/12)
The plan is failing on every measure: cost, schedule and quality. The shortfall will have to be met by reliable power — but the nuclear fleet is retiring and gas is ageing. Time for a Parliamentary investigation and cancellation. (11/12)
If you enjoyed this thread, please like and share. You can sign up for free to read the full article
on the link below (12/12): open.substack.com/pub/davidturve…
Hi @threadreaderapp unroll please
If you enjoyed this thread, please like and share. You can sign up for free to read the full article
on the link below (12/12): open.substack.com/pub/davidturve…
Hi @threadreaderapp unroll please.
• • •
Missing some Tweet in this thread? You can try to
force a refresh
It isn't just the Climate Change Act that enforces Net Zero. The law fixes the destination, Carbon Budgets set the pace, delivery plans divide the burden, spatial plans allocate geography and regulators authorise the spending. Beyond democratic control. A thread 🧵 (1/n)
The UK has constructed a permanent system of carbon, environmental and spatial governance. It doesn't operate through one law or central office. The power lies in multiple institutions working together as a single machine (2/n)
The Climate Change Act fixes the emissions destination. Carbon budgets set the permitted pathway. (3/n)
🚨When frequency & inertia limits and safety margin breaches are met with denial and obfuscation, you know NESO is facing a serious credibility outage. Whistleblowers have gone to the Shadow Energy Secretary with concerns about grid security. What is going on? A thread 🧵(1/13)
On 23 June, GB grid frequency stayed below the normal 49.8Hz operating limit for extended periods. NESO claims statutory limits weren’t breached, but Times reporting says margin limits were breached. The prolonged dip raises serious questions. (2/13)
No Electricity Margin Notices were issued beforehand. NESO had to cut exports to the Netherlands and France to stabilise the system. Emergency measures instead of prevention. Times report here: (3/13)
🚨The UK electricity grid expansion for Clean Power 2030 & Net Zero 2050 is in chaos. We need to build twice as much transmission grid in the next 5 years as in the last decade — but costs are exploding and projects are massively delayed. A thread 🧵(1/9)
NESO already forecasts transmission costs more than tripling from £2.8bn per year in 2020/21 → £8.9bn in 2026/27. And to rise again to → £13.6bn by 2030/31 These figures already look like serious underestimates. (2/9)
Ofgem’s 2022 ASTI framework listed key projects at £23.3bn. By late 2025, Ofgem was warning that over £70bn of transmission upgrades are needed in the next five years alone. Reality is even worse. (3/9)
UK grid costs set to soar even higher. Grid integration costs are already forecast to triple from £8bn to £25bn by 2030/31. Now NESO is asking for another £89bn of grid spending beyond 2030. Why this matters for your bills...A thread 🧵 (1/9)
Grid integration costs consist of backup from the capacity market, grid balancing and grid expansion. All set to soar over the next few years. (2/9)
Capacity Market costs exploded from under £10m in 2017 to over £1.6bn by 2026. Monthly costs forecast to double to £250-370m in October 2026. (3/9)
🚨The UK Government’s plug-in solar safety report is a shocker! They’re pushing plug-in panels hard for net zero, but the safety study by unqualified person has serious flaws that put homeowners at risk. Thread 🧵(1/11)
In 2025 the government committed to plug-in solar and promised a proper safety study. What they actually delivered falls far short. (2/11) gov.uk/government/pub…
The £80,309 contract went to sole bidder, Arceio Ltd — a dormant company incorporated in July 2024. Its director has no electrical engineering or safety qualifications. (3/11) find-tender.service.gov.uk/Notice/066722-…
Everything about Net Zero is fake. The temperature record, climate models, the “climate emergency”, cheap renewables, green jobs, and even the claimed emissions cuts — it’s all built on lies and distortions. A thread 🧵(1/12)
The global temperature record has been repeatedly “adjusted”. Past cooled, present warmed to exaggerate warming. Tony Heller has documented it for years. UK Met Office stations are mostly poor quality with huge error margins. (2/12)
Climate models run too hot. High sensitivity estimates don’t match observations. Even the IPCC has dropped the extreme RCP8.5 scenario. The scare stories are built on faulty models. (3/12)