The guest himself mentioned the scope of the PPI but could not add the numbers or does not know how power vectors add up to MW. /1 @channelstv 10 power transformers plus 10 mobile substations = 1320MVA

7 upgrade substations = 1,130MVA

8 New substations = 1,860MVA

5 new lines of over 200km

Upgrade of Zaria- Kwanar Dangora- Kumbotso line

Total transmission capacity to be added in phase 1 of the PPI = 4,310MVA. /2
Dec 28, 2022 5 tweets 2 min read
Mobile Substations on Trailers heading to Nigeria from France for delivery in January 2023. @HMPowerNG , @toluogunlesi , @NGRPresident Image But we are delivering more than mobile substations in phase 1 of the PPI
Dec 23, 2022 11 tweets 4 min read
Let me tell you a bit about the great work being achieved under the Presidential Power Initiative (PPI) with @Siemens, @Siemens_Energy in a well coordinated legacy by @MBuhari, & @NGRPresident
The Presidential Power Initiative (PPI) is in three phases. Phase 1 aims to unlock 2000MW of stranded capacity by removing constraints in the transmission and distribution networks.
Dec 17, 2022 6 tweets 3 min read
Why did we introduce Mobile Substations under the Presidential Power Initiative?
@toluogunlesi , @AjuriNgelale , @HMPowerNG , @NGRPresident twitter.com/i/web/status/1… If you lose a large power transformer supplying a large part of your state, rather than have prolonged power outages that can last many months, we simply drive down a mobile transformer to your state within few hours, hook up to d power lines around, & restore power supply.
Dec 15, 2022 6 tweets 4 min read
Let me introduce to you this new born child of the Nigerian Power System; the brain child of His Excellency, President of the Federal Republic of Nigeria, President Muhammadu Buhari, who gave us this great legacy of the Presidential Power Initiative (PPI). /1
@toluogunlesi twitter.com/i/web/status/1… Behind me is the first of it's kind Mobile Substation in Nigeria. This 63MVA, 132/33kV Mobile Substation is the first of ten to be delivered under the Presidential Power Initiative. /2 twitter.com/i/web/status/1…