Siege Profile picture
Infrastructure | Geopolitics | Geoeconomics | Politics | Economy | Space Tech | Defence | Cricket
Feb 5 8 tweets 4 min read
🚄 THREAD: Ashwini Vaishnaw reveals key details about Bharat’s future High-Speed Rail network beyond Mumbai-Amdavad.

7 new bullet train corridors, indigenous tech push & long-term vision for Bharat’s HSR future. Here's what he said 👇

(1/n)
#BulletTrain Image
Image
Image
Image
Union Railway Minister Ashwini Vaishnaw says Bharat is preparing DPRs for 7 new high-speed corridors, focusing on indigenous capability after learning from the Mumbai-Amdavad bullet train project.

(2/n)
Jul 19, 2025 5 tweets 4 min read
Bhogapuram International Airport (Vizianagaram, Andhra Pradesh)
Terminal: 1B+G+3 floors with 38 jet bridges, parking bays, retail, restaurants & recreational space occupying half the GLA.
Phase 3 pax capacity: 1.8 Cr+
(1/n)
#Infrastructure #Aviation #Airport #AndhraPradesh Image
Image
Image
Image
Spread across 2,204 acres
Runway: 3.8 km with CAT I ILS, edge/flood/apron lighting
Includes hangar, fueling, MRO, cargo, general aviation, remote aircraft positions
Pax capacity: 60L (2026), then 1.2 Cr → 1.8 Cr → Exit: 4 Cr+
(2/n)
#Infra #Aviation #Airport #AndhraPradesh Image
Image
Image
Image
Jul 18, 2025 10 tweets 3 min read
NCERT Drops Truth Bombs: British Took Bharat From Marathas & not Mughals, Looted $45 Trillion And Used Our Taxes To Build Railways.

Railways weren’t a gift — they were built with Indian taxes to serve British loot.

NCERT Class 8 book isn’t holding back.
(1/n)
#NCERT #History Image In the 1700s, Bharat had 25% of the world GDP.
By 1947, just 5%.
Why?

Because the British weren’t traders — they were economic parasites.
(2/n)
#BritishLoot #DrainOfWealth Image
Mar 16, 2025 7 tweets 5 min read
Upcoming Rolling Stocks of Indian Railways
1. Vande Bharat Sleeper – BEML

Manufacturer: BEML
Launch: 2025
Speed: 160-180 kmph
A sleeper variant blending modern design with overnight comfort.

#VandeBharat @RailMinIndia #Bharat
(1/n) Image
Image
Image
Image
Upcoming Rolling Stocks of Indian Railways
2. Vande Bharat Sleeper – Kinet

Manufacturer: Kinet
Launch: 2025
Speed: 160-180 kmph
A sleeper version offering efficient operations and enhanced amenities.

#RailInfra @RailMinIndia #Bharat
(2/n) Image
Image
Image
Image