Interacted with RWAs & all Ward Nodal officers regarding issues related to effective functioning of Ward committees in combating #COVID19. The following were discussed:
1 Ensuring that 3Ws are followed and 3Cs are avoided in all areas. (1/6)
2 COVID-like symptoms in any resident, drivers/maids to be immediately notified & tested
3 Ensure public health communication & actions are pursued not just in apartment area but also in slums/areas where people who work in apartments live. (2/6)
4 Testing camps to be owned & arranged by RWAs within & beyond their communities.
5. Support & help monitor those with mild or moderate illness in home isolation. Arrange tests/pulse oximetry measured for all elderly and those with comorbidities. (3/6)
6 Help in conducting medical camps in every ward, assembly area, polling station area & ensure all citizens are invited.
Organize gifts/incentives for those who mobilize more people to attend such camps. (4/6)
7. Invite people in IT & those active on social media to influence and spread awareness regarding testing & early recognition of breathlessness to prevent mortality
8. Organize online Quiz and community bonding exercises so that people share their experiences and support. (5/6)
Involve young people & children to spread awareness.
9 Covid19 is not over. The toughest challenge is NOW since there is free population movement everywhere. This is the time to be more careful. (6/6)
This is the second most wet rainy season seen by Bengaluru in the last 50 years. The torrential rains from 30th August to 4th September had been 5 times the normal rainfall. With 162 lakes full the rains have caused flooding, 1/4
however the situation was brought under control quickly and the flooding is localised between two biggest lakes Bellandur and Varthur. The flooding is only limited to 5-6 sq km out of 800 Sq km area of Bengaluru. 2/4
Only Mahadevpura zone out of 8 zones got severely affected. We are using around 20 boats and equal number of pumps to evacuate and flush out the water. Action is taken to remove obstacles in the water ways to prevent flooding. 3/4
ಬಿಬಿಎಂಪಿ ಕೋವಿಡ್19 ವಾರ್ ರೂಂ ಬುಲೆಟಿನ್ 15-8-2021
🔹ಒಟ್ಟು ಸೋಂಕಿತ ಪ್ರಕರಣಗಳು:12,32,902
🔹ಒಟ್ಟು ಗುಣಮುಖರಾದವರು:12,08,798
🔹ಒಟ್ಟು ಸಾವಿನ ಪ್ರಕರಣಗಳು:15,938
ಕಳೆದ 24 ಗಂಟೆಗಳು
🔹ಒಟ್ಟು ಸೋಂಕಿತ ಪ್ರಕರಣಗಳು:305
🔹ಒಟ್ಟು ಗುಣಮುಖರಾದವರು:336
🔹ಒಟ್ಟು ಸಾವಿನ ಪ್ರಕರಣಗಳು:3*
BBMP Covid-19 War Room Bulletin 15-8-2021
🔹Total Positive Cases:12,32,902
🔹Total Recovered Cases:12,08,798
🔹Total Deaths:15,938
Last 24 Hours
🔹Total Positive Cases:305
🔹Total Recovered Cases:336
🔹Total Death Cases:3*
*Covid deaths occurred today : 00 | Covid deaths occurred in last 72 hrs, reported today: 03
ಬಿಬಿಎಂಪಿ ಕೋವಿಡ್19 ವಾರ್ ರೂಂ ಬುಲೆಟಿನ್ 14-8-2021
🔹ಒಟ್ಟು ಸೋಂಕಿತ ಪ್ರಕರಣಗಳು:12,32,597
🔹ಒಟ್ಟು ಗುಣಮುಖರಾದವರು:12,08,462
🔹ಒಟ್ಟು ಸಾವಿನ ಪ್ರಕರಣಗಳು:15,935
ಕಳೆದ 24 ಗಂಟೆಗಳು
🔹ಒಟ್ಟು ಸೋಂಕಿತ ಪ್ರಕರಣಗಳು:377
🔹ಒಟ್ಟು ಗುಣಮುಖರಾದವರು:365
🔹ಒಟ್ಟು ಸಾವಿನ ಪ್ರಕರಣಗಳು:1*
BBMP Covid-19 War Room Bulletin 14-8-2021
🔹Total Positive Cases:12,32,597
🔹Total Recovered Cases:12,08,462
🔹Total Deaths:15,935
Last 24 Hours
🔹Total Positive Cases:377
🔹Total Recovered Cases:365
🔹Total Death Cases:1*
ಬಿಬಿಎಂಪಿ ಕೋವಿಡ್19 ವಾರ್ ರೂಂ ಬುಲೆಟಿನ್ 13-8-2021
🔹ಒಟ್ಟು ಸೋಂಕಿತ ಪ್ರಕರಣಗಳು:12,32,220
🔹ಒಟ್ಟು ಗುಣಮುಖರಾದವರು:12,08,097
🔹ಒಟ್ಟು ಸಾವಿನ ಪ್ರಕರಣಗಳು:15,934
ಕಳೆದ 24 ಗಂಟೆಗಳು
🔹ಒಟ್ಟು ಸೋಂಕಿತ ಪ್ರಕರಣಗಳು:425
🔹ಒಟ್ಟು ಗುಣಮುಖರಾದವರು:424
🔹ಒಟ್ಟು ಸಾವಿನ ಪ್ರಕರಣಗಳು:5*
BBMP Covid-19 War Room Bulletin 13-8-2021
🔹Total Positive Cases:12,32,220
🔹Total Recovered Cases:12,08,097
🔹Total Deaths:15,934
Last 24 Hours
🔹Total Positive Cases:425
🔹Total Recovered Cases:424
🔹Total Death Cases:5*
Reviewed the preparations for Independence day celebrations to be held at Field Marshal Manekshaw parade ground in BBMP limits, along with Bengaluru police commissioner Shri Kamal Pant. Bengaluru Urban DC Shri J. Manjunath and others were present.
ನಗರ ಪೊಲೀಸ್ ಆಯುಕ್ತರಾದ ಶ್ರೀ ಕಮಲ್ ಪಂಥ್ ಅವರೊಂದಿಗೆ ಬಿಬಿಎಂಪಿ ವ್ಯಾಪ್ತಿಯ ಫೀಲ್ಡ್ ಮಾರ್ಷಲ್ ಮಾಣಿಕ್ ಷಾ ಪರೇಡ್ ಮೈದಾನದಲ್ಲಿ ನಡೆಯಲಿರುವ ಸ್ವಾತಂತ್ರ್ಯ ದಿನಾಚರಣೆಯ ಅಂಗವಾಗಿ ಪೂರ್ವಭಾವಿ ಸಿದ್ಧತೆಗಳನ್ನು ಪರಿಶೀಲಿಸಿದೆ.
ಜಿಲ್ಲಾಧಿಕಾರಿಗಳಾದ ಶ್ರೀ ಜೆ. ಮಂಜುನಾಥ್ ಹಾಜರಿದ್ದರು.
ಫೀಲ್ಡ್ ಮಾರ್ಷಲ್ ಮಾಣಿಕ್ ಷಾ ಪರೇಡ್ ಮೈದಾನದಲ್ಲಿ ಆಗಸ್ಟ್ 15ರಂದು ನಡೆಯುವ ಸ್ವಾತಂತ್ರ್ಯ ದಿನಾಚರಣೆಯ ಅಂಗವಾಗಿ ನಡೆಯುತ್ತಿರುವ ಪೂರ್ವಭಾವಿ ಸಿದ್ಧತೆಗಳ ವಿವರ ಇಲ್ಲಿದೆ.
Here are the details on the preparations being made for the 75th Independence Day Celebration at Field Marshal Manekshaw parade ground.
ಬಿಬಿಎಂಪಿ ಕೋವಿಡ್19 ವಾರ್ ರೂಂ ಬುಲೆಟಿನ್ 13-5-2021
🔹ಒಟ್ಟು ಸೋಂಕಿತ ಪ್ರಕರಣಗಳು:10,14,996
🔹ಒಟ್ಟು ಗುಣಮುಖರಾದವರು:6,46,305
🔹ಒಟ್ಟು ಸಾವಿನ ಪ್ರಕರಣಗಳು:9,126
ಕಳೆದ 24 ಗಂಟೆಗಳು
🔹ಒಟ್ಟು ಸೋಂಕಿತ ಪ್ರಕರಣಗಳು:15,191
🔹ಒಟ್ಟು ಗುಣಮುಖರಾದವರು:16,084
🔹ಒಟ್ಟು ಸಾವಿನ ಪ್ರಕರಣಗಳು:161
BBMP Covid-19 War Room Bulletin 13-5-2021
🔹Total Positive Cases:10,14,996
🔹Total Recovered Cases:6,46,305
🔹Total Deaths:9,126
Last 24 Hours
🔹Total Positive Cases:15,191
🔹Total Recovered Cases:16,084
🔹Total Death Cases:161