#Whitefield Metro Depot: •Foundation pit and Diaphragm wall construction on either sides of Dinnur Road
•Large number of workmen from VASCON and ITD CEM are seen at work.
•Lot of activity happening at Whitefield Depot
•05/10/20

@TheMetroRailGuy @ChristinMP_TOI @Lolita_TNIE ImageImageImageImage
These three pics are to the extreme end of Whitefield Metro Depot.
West most part of the depot from Dinnur Road. ImageImageImage
#Whitefield #MetroDepot

•To the West end of Dinnur road, First concrete block (pic1) getting lifted up on the compound wall
•Lot many new concrete structures shaping up
•Utility ducts and other diaphragm wall works going on too

#Bangalore
@TheMetroRailGuy ImageImageImageImage
Adding pics from #WhitefieldMetroDepot from Nov’20 to the main thread. ImageImageImageImage
#Whitefield #MetroDepot #Bangalore

•The west most part of the depot (literally the end point of entire area) has got its #Firstbuilding
•compound wall on one side is almost done
•Not a single 🌲 has been 🪓 yet
•Huge number of Pillars (pics 3&4) are seen. @TheMetroRailGuy ImageImageImageImage
•All above pics and this one are from West of #Dinnur Road in Whitefield.
•Pillars from pics 3&4 (not sure what they are meant for) are in very large numbers on the other side of road too. Not all are seen here. Image
#WhitefieldMetroDepot

West side of Dinnur Road, this is the end point of the entire Depot. A building, sub station and electrical works are going on 👍

12-04-2021 @TheMetroRailGuy @WFRising @KARailway @ChristinMP_TOI @bengalurutrains @sandeeprrao1991 ImageImageImageImage
A section of the #Dinnur Road which connects to Kadugodi flyover from ITPL main road seems to be closed permanently(the regular route), there is a slight deviation which again connects to the same road. #WhitefieldMetroDepot passes by this section, hence the road is closed. ImageImageImageImage
This is one of the longest threads. Covered #Whitefield #MetroDepot from all sides and even from middle of the ground.

Now these aerial shots will give a clear picture of all the lines that head to the depot.

Total #WhitefieldDepot can be seen in these pics @TheMetroRailGuy ImageImageImageImage
Video of #WhitefieldMetroDepot

• Workshop Bay
•Repair & Inspection Bay
•Substation
•4 curvy tracks heading into Depot from Whitefield 🚉

……& the lovely greenery, that’s #KadugodiTreePark. I remember many asked for location, u can see it here clearly

@TheMetroRailGuy
Let’s see where we are with #PurpleLine’s September trial runs between #Whitefield and #Baiyappanahalli

You can notice the tracks, 🚉 work, Inspection, repair & workshop bays apart from a Substation. These pics are from Whitefield Depot & Kadugodi 🚉 26/07/22

@TheMetroRailGuy ImageImageImageImage
Final set
#Bangalore #PurpleLine #Whitefield #Kadugodi #NammaMetro

That under construction building is #Sumadhura Capitol Hills

26/07/2022 ImageImageImageImage

• • •

Missing some Tweet in this thread? You can try to force a refresh
 

Keep Current with Whitefield Woes

Whitefield Woes Profile picture

Stay in touch and get notified when new unrolls are available from this author!

Read all threads

This Thread may be Removed Anytime!

PDF

Twitter may remove this content at anytime! Save it as PDF for later use!

Try unrolling a thread yourself!

how to unroll video
  1. Follow @ThreadReaderApp to mention us!

  2. From a Twitter thread mention us with a keyword "unroll"
@threadreaderapp unroll

Practice here first or read more on our help page!

More from @WF_Watcher

Aug 21, 2020
Cheers from TIN Factory, #Bangalore. 👍

•Barricades up
•Piling Rig machine back in action
•Pillars and steel are coated with some chemical/paint
21/08/20

@TheMetroRailGuy @ChristinMP_TOI @Naveen_MIRROR @Lolita_TNIE @tinucherian @sandeeprrao1991 @bengalurutrains @KARailway ImageImageImageImage
Set 2: ImageImageImage
•Similar set up was done few months ago too n everything disappeared after few days. Feared if it would happen again
•But No, this time work is SET TO START at #TIN Factory #Bangalore
•At 5:00PM, rebar cages have arrived and rig machine is in action 👍(video)
@TheMetroRailGuy ImageImageImageImage
Read 14 tweets
May 19, 2020
#NammaMetro Pink Line 4 - Gottigere to Nagawara (21.38KM). Start point at Kalena Agrahara was a bit of surprise (see pics). And there were many surprises till Dairy Circle. #Simplex —> quite COMPLEX @TheMetroRailGuy @NaveenMIRROR @ChristinMP_TOI @bengalurutrains @KARailway ImageImageImageImage
Near Meenakshi Mall and Mantri Residency Road 19-05-2020. There are many blank stretches in between!! @shashibk @NammaBengaluroo @sandeeprrao1991 ImageImageImageImage
At IIM Bangalore, Bilekahalli and surrounding areas. 19-05-2020 ImageImageImageImage
Read 8 tweets

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3/month or $30/year) and get exclusive features!

Become Premium

Don't want to be a Premium member but still want to support us?

Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal

Or Donate anonymously using crypto!

Ethereum

0xfe58350B80634f60Fa6Dc149a72b4DFbc17D341E copy

Bitcoin

3ATGMxNzCUFzxpMCHL5sWSt4DVtS8UqXpi copy

Thank you for your support!

Follow Us on Twitter!

:(