The Tilenga project is planned to develop nine fields, namely;jobi-Rii, Ngiri, Gunya, kasamene, Wahrindi, Kigogole, Nsoga, Ngege, and Ngara. #TilengaSiteUpdates#Tilenga
The completion of the Tilenga and EACOP projects required the implementation of a land acquisition program covering some 6,400 hectares. #TilengaSiteUpdates#Tilenga
The ESIA report for the Tilenga project was submitted to @nemaug in June 2018. @PAU_Uganda organized two public hearings for the ESIA on 12th and 15th November 2018 in Buliisa and Nwoya District. #TilengaSiteUpdates #Tilenga
Award of the Tilenga project contracts including Engineering procurement, and construction (EPC) contracts and drilling are awaiting FID. #TilengaSiteUpdates#Tilenga
• • •
Missing some Tweet in this thread? You can try to
force a refresh
Happening : NATIONAL FEEDBACK SEMINAR (OFFICIAL RELEASE)
FOR THE 2021 NAPE FINDINGS #UNEB_NAPEreport2021
@JCMuyingo: We are gathered here this morning as stakeholders in education to receive the findings of the study of the “Effects of #COVID19 Pandemic on Teaching and Learning at Primary & Secondary Education level in Uganda” which was conducted by @UNEB_UG through its NAPE prog.
The findings are of great significance to our education sector because it reveals the gaps in the learning of our children as a result of the COVID-19 pandemic. #UNEB_NAPEreport2021