South East on Track Profile picture
Jun 30, 2022 12 tweets 9 min read Read on X
THREAD:
There's been a lot of discussion recently about @Dept_Transport not releasing the modelling for the Strategic Rail Review or the Waterford-Limerick upgrades. Here's why modelling is important (there's maths involved - please bear with us)
The draft Waterford Metropolitan Area Transport Strategy #WMATS is currently open to public consultation til July 12. Buried in it is an analysis of a commuter rail network for Waterford - 3 trains an hour Carrick-on-Suir-Rosslare, Waterford-New Ross & 2 per hr Kilkenny-Waterford
@TFIupdates omitted #Wexford Town from this model, despite it being on the rail line and included as a major trip generator as part of their regional analysis. But that's not the main problem with this model/analysis.
Acording to @TFIupdates the proposed Waterford commuter rail system performs poorly, with Carrick-Rosslare having 24% occupancy and Waterford-Kilkenny at 19% (We don't call for reopening the New Ross line so we'll omit it for now) - but what is the proposed capacity?
Another document shows each train proposed has 285 seats, with a capacity of 350! (hourly cap. 1050)
For reference that's bigger than a 3 (190 seats) or 4 car (262 seats) 22000 IC train that's used on the Inter City Network - why such large trains for a local commuter network?
Looking at commuter rail in other parts of Munster - @IrishRail don't use such big trains: For the Cork-Cobh service the Class 2600 is used (130 seats). How does this unit perform using the NTA numbers? Pretty well - with 66% occupancy Kilk-Waterford and 62% Carrick-Rosslare
Example #2 from Munster: Limerick-Nenagh uses the Class 2800 (85 seats) - how does this do using the NTA numbers? Even better - with Kilkenny-Waterford fully seated and Carrick-Rosslare at 94% seated! Comparing like-for-like shows there's numbers for commuter rail in Waterford.
So what to make of all this? @Dept_Transport & @TFIupdates are in the process of making huge decisions on mobility & transport infra in our region and it's disappointing to see the new NIFTI intervention hierarchy being manipulated like this to give a predetermined outcome.
For Oireachtas members in the region & advocates for sustainable transport - it's vital you get submissions into the #WMATS to challenge these figures by the NTA which deliberatly downplay the possibilites for rail
If you want to take a deeper dive into the #WMATS, please come to our joint webinar with @BikeWaterford next Tuesday at 8pm. DM or email for the link.

• • •

Missing some Tweet in this thread? You can try to force a refresh
 

Keep Current with South East on Track

South East on Track Profile picture

Stay in touch and get notified when new unrolls are available from this author!

Read all threads

This Thread may be Removed Anytime!

PDF

Twitter may remove this content at anytime! Save it as PDF for later use!

Try unrolling a thread yourself!

how to unroll video
  1. Follow @ThreadReaderApp to mention us!

  2. From a Twitter thread mention us with a keyword "unroll"
@threadreaderapp unroll

Practice here first or read more on our help page!

More from @seontrack

Dec 14, 2022
🧵 1/4 Many of you will have seen articles recently with @wlrfm @WaterfordNS @KKPeopleNews on the future of the Barrow Bridge on the #Wexford to #Waterford rail line. @IrishRail have announced that the bridge will be pinned open due to a ship collision in Feb 2022
2/4 The bridge is an engineering marvel (almost 1/2 a mile long) that has functioned since 1906 - this video from @tidesntales gives you an idea of its scale and the opening & closing mechanism Several trains crossed the bridge in 2022 (after the accident) ImageImage
3/4 @IrishRail stated they will commence repair work on the bridge once compensation has been received from the ship's insurer. However, this has happened before. In 1991 a similar bridge strike occurred. The matter was with the High Court until 2001! A full decade! Image
Read 5 tweets

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3/month or $30/year) and get exclusive features!

Become Premium

Don't want to be a Premium member but still want to support us?

Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal

Or Donate anonymously using crypto!

Ethereum

0xfe58350B80634f60Fa6Dc149a72b4DFbc17D341E copy

Bitcoin

3ATGMxNzCUFzxpMCHL5sWSt4DVtS8UqXpi copy

Thank you for your support!

Follow Us!

:(