@CityPowerJhb Profile picture
May 10 4 tweets 1 min read Twitter logo Read on Twitter
#JoburgUpdates #Hursthill

Team is currently on site in Craighall, attending to an outage that was triggered by a blown switch. They are in the process sourcing material for repairs. ETR will be communicated once materials are delivered on site.
we are aware that outages from the Parkhurst Substation and Industria Substation have have not yet been attended due to overstretched resources. As soon as the teams finalise restoring supply in Roosevelt and Craighall, they will move to Parkhurst and Industria - respectively.
The outages in Roosevelt and Craighall have been ongoing since Monday. We appeal for patience from customers in Parkview, Greenside East, Westcliff, Parkwood and Bosmont from Industria Substation side - for the unfortunate delays.
Once those two prolonged outages are resolved, they will free up some resources needed to speedily attend to other outages. We sincerely apologise for the delays.^GR

• • •

Missing some Tweet in this thread? You can try to force a refresh
 

Keep Current with @CityPowerJhb

@CityPowerJhb Profile picture

Stay in touch and get notified when new unrolls are available from this author!

Read all threads

This Thread may be Removed Anytime!

PDF

Twitter may remove this content at anytime! Save it as PDF for later use!

Try unrolling a thread yourself!

how to unroll video
  1. Follow @ThreadReaderApp to mention us!

  2. From a Twitter thread mention us with a keyword "unroll"
@threadreaderapp unroll

Practice here first or read more on our help page!

More from @CityPowerJhb

May 11
#JoburgUpdates #HursthillSDC

City Power apologises to the residents of Riverlea for the power supply interruptions that
frequently occur in the area post loadshedding. ^LP
We are however concerned about the protest action in the area which will further exarcebate the situation as we may not be able to send teams into the area to attend to the
outages.
While we understand and appreciate the sheer frustration and inconvenience caused, it is unfortunate that residents have opted to embark on a protest action, which will worsen and lengthen the duration of the outage.
Read 9 tweets
May 10
#AlexandraUpdate

#AlexandraSubstation affecting #East Bank has been restored, but one load center remains off. The Mini Substation is affecting Chariots of Fire Street. The Mini Sub has been ordered, and the contractor was not able to collect all the materials for repairs.
#Alexandra Substation Jabulani Crescent Distributor tripped due to to a cable fault. The test branch was not able to locate the fault.

ETR will be communicated once the fault has been loacted
#Alexandra Substation Bush Buck Distributor tripped affecting #Far East Bank, West Bank, Stjwetla and surrounds. Our resources are on site locating the fault.

ETR will be communicated once the fault has been located.
Read 5 tweets
May 10
#LoadsheddingStage 6

Blocks 5, 9, 13, 1, 4 and 8 affected from 12:00 until 14:30

Block 5 and 9 to be affected again at 14:00 ^KM ImageImageImageImage
ImageImageImageImage
ImageImageImageImage
Read 4 tweets
May 9
#AlexSub

#VascoDaGama affecting 15th to 20th Ave (Between Vasco & Roosevelt) awaiting Eskom operators to restore on their side.

Kassie Distributor affecting 1st to 8th Ave (Hofmeyer & Selbourne Rd) investigation is halted by loadshedding, will resume afterwards^DR
#AlexandraSub

20th Avenue dist (Between Selbourne and Roosevelt) will resume the investigations after the current loadshedding slot (22h30)

Adam block and Jabulani Cresent distributors, restoration work will commence after #Loadshedding ^DR
Power is fully restored to customers who were affected by #AdamBlock and #KassieDistributor

All affected customers restored, thank you so very much Jo'burg for your patience and understanding during the outage ^DR
Read 5 tweets
May 9
#CityPowerUpdates

#LenasiaSDC

#LotusSubstation: Operators are investigating the cause of the outage which has affected Vlakfontein and Hospital Hills.
#LunarSubstation: Repairs are underway following an outage in Magson Manor that was caused by cable theft.
#NirvanaSubstation: Power will be fully restored after loadshedding, Lenasia ext. 13 has been affected.
Read 5 tweets
May 9
#CityPowerUpdates #LenasiaSDC

Golddev Switching Station: Four of five distributors have been fully restored, the team will resume work this morning. The team could not continue work last night due to visibility issues. Areas affected: parts of Freedom Park and Devland.
#LenasiaSDC

Lunar Substation: Operators have been dispatched to investigate a suspected outage in Magson Manor.
Nirvana Substation: 50% of Lenasia ext. 13 is off, the team will be onsite this morning to resume jointing and then start with the restoration process.
Read 4 tweets

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3/month or $30/year) and get exclusive features!

Become Premium

Don't want to be a Premium member but still want to support us?

Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal

Or Donate anonymously using crypto!

Ethereum

0xfe58350B80634f60Fa6Dc149a72b4DFbc17D341E copy

Bitcoin

3ATGMxNzCUFzxpMCHL5sWSt4DVtS8UqXpi copy

Thank you for your support!

Follow Us on Twitter!

:(