My Authors
Read all threads
MEGATHREAD: Every single "explanation" by guilters about James Safechuck's train station lie over the last 3 months and why their desperate attempts are even more embarrassing and problematic to their broken agenda.

#MJInnocent #IKnewLeavingNeverlandWasBS #FactsDontLiePeopleDo
OVERVIEW: James Safechuck describes graphic sexual abuse in 1988-89 in the upstairs room of the iconic Neverland train station. He even supplied photos of the station to Dan.

As confirmed repeatedly, the train station did not begin development until late-1993, completed in 1994.
GUILTER: There was a storage building off-site where train cars would be stored. "It's not hard to imagine that building contained a small upstairs space."

FACT:🤦🏻‍♂️This maintenance barn has no indication of an upstairs, just an exhaust vent. Only THE "train station" had upstairs.
GUILTER: Dan Reed's first explanation - "No doubt about the station date. The date they have wrong is the end of the abuse."

FACT: James swore in court all "abuse" ended in 92 & was already growing distant in '90; in LN says station abuse occurred during honeymoon phase (88-89).
GUILTER: Dan Reed's second explanation - "Train station was already complete before the 93 permit was approved, says Harrison Funk" (with link to podcast)

FACT: Harrison Funk responded almost immediately that the photo shoot he spoke of was "in JUNE 1994, definitely NOT BEFORE."
GUILTER: There are two books that mention a train station in 1990, one by Randall Sullivan and another by Bill Whitfield.

FACT: Neither of these authors had any direct knowledge of Neverland in the 90s and relied on broad assumptions for their books. Bill confirms this in tweet.
GUILTER: There were numerous train stations around Neverland as seen on the Neverland guest map, JS meant another one.

FACT: The other "stations" are gazebos and open shelters. Again there was only ONE train station with an enclosure & upstairs - it did not exist in 1988-1993.
GUILTER: There is a Getty Image dated 1990 that shows the fully constructed train station.

FACT: An error in the metadata on Getty Images caused ALL PHOTOS from the set of the 2003-04 Neverland raids to default to 1990. Those images have now been updated to read January 2004.
GUILTER: The aerial photo dated August 25, 1993 that shows only the flower clock but no train station is not the correct date.

FACT: This photo was one of several shot from helicoper after the 93 Chandler allegations. Starr confirmed the date being within 2-3 days of accuracy.
GUILTER: The train station was mostly up by Dec. 93 so it is only a discrepency of up to one year from when James said the abuse ended.

At end of 93, AP confirmed the building still was under construction without windows, doors or interiors. James claims station abuse was 88-89.
GUILTER: James was traumatized and it is a natural occurrence in CSA victims to misremember details.

FACT: James repeatedly describes the "relationship" w/ MJ as pleasant and like a couple, not traumatic ("I don't have any unpleasant memories...") He never claims bad memory.
GUILTER: The train station was constructed before the building permits were completed.

FACT: Verified aerial pic from Aug. 25, '93 confirms no early construction. The committee meeting to approve the concept did not occur until Aug. 6, 1993, signed in Sep. Grading permit in Oct.
GUILTER: Diane Dimond - "Train STOPS existed at the time. Think a 10-12 year old knows the difference between a stop and a "station"? Come on!

FACT: A toddler would know the difference between an outdoor train STOP and an 2-story STATION. James was 39 when he told this story 🤣.
GUILTER: There were many buildings that James could had been referring to, including MJ's upstairs of his home where he had a mini trainset.

FACT: James was a regular at Neverland and very familiar with all of the properties. He mentions MJ's room/house as a separete location.
GUILTER: Dan Reed - "James was at NL before & after the construction of the train station. The 2 photos were in fact taken by James."

FACT: Another one of Dan's attempts to defend James' impossible story. Nobody denies James was IN the station, just that he was not abused there.
GUILTER: Dan Reed - "sexual contact between James and MJ continued until James Safechuck was in his teenage years."

FACT: James would had been 16 yrs. old when the train station was completed. This dismantles the entire LN narrative, Reed's own claims, and James' civil lawsuit.
GUILTER: There was a different building before the train station was built that James was referring to.

FACT: The train for this station arrived in 11/1993. Tracks + station were still being worked on in 1994. The prior building nearby was a utility pump room near septic tank 💩
GUILTER: A drawing has date of 7-28-93 next to "existing hobby bldg." It was already constructed.

FACT: Map is from a Dec 10 1993 proposal for station utility room & rides. Station was already WIP & unrelated to request so marked existing. 7/28 was week before committee hearing.
GUILTER: Oprah - "When you're in the midst of trauma, you may not remember the exact time... Was it Thursday or Wednesday? This hotel or that hotel?"

FACT: This isn't discrepancy of 1 day or similar location. It is claim of abuse in upstairs of station 4-6 yrs before it existed.
Missing some Tweet in this thread? You can try to force a refresh.

Enjoying this thread?

Keep Current with TSCM

Profile picture

Stay in touch and get notified when new unrolls are available from this author!

Read all threads

This Thread may be Removed Anytime!

Twitter may remove this content at anytime, convert it as a PDF, save and print for later use!

Try unrolling a thread yourself!

how to unroll video

1) Follow Thread Reader App on Twitter so you can easily mention us!

2) Go to a Twitter thread (series of Tweets by the same owner) and mention us with a keyword "unroll" @threadreaderapp unroll

You can practice here first or read more on our help page!

Follow Us on Twitter!

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3.00/month or $30.00/year) and get exclusive features!

Become Premium

Too expensive? Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal Become our Patreon

Thank you for your support!