1. Petroleum Division (PD) has issued very political and misleading tweets in reaction to my earlier tweets. Before that too the Energy Ministry had issued a factually incorrect press release attacking me that was not worthy of response. But today I think it’s best to respond.
2. The Energy Ministry in a press release dated Sept 25 said that “perhaps Mr Ismail does not know that the terminals are running at full capacity”. Well, THEY ARE NOT. From Sept 1 to the date the Ministry sent the press release, the PGPL terminal was running at 475 MMCFD
3. against the contracted capacity of 600 MMCFD. The statements of the Ministry are dishonest, and disappointing.

Then the Ministry again said that a 17 km long pipeline is required to give more gas to Karachi. This again is not true. They can give more gas to Karachi if they
4. wish with the swap mechanism that our Govt used to induct 400 MMCFD RLNG in the SSGC gas network and gas in upper Sindh was inducted into the SNGPL network. Moreover, even if their assertion were true, which it is not, does the Ministry need 2 years to build a 17 km pipeline?
5. Now to tweets by the PD. But first let me make a comment about this Govt: it loves running power plants on Furnace Oil which produces less than two-thirds as much power as LNG per rupee of fuel, and on Diesel which costs about 3 times more than LNG per unit of electricity.
6. This June & July govt was producing power through Diesel & Furnace Oil while there was excess terminal capacity to import more LNG, losing the exchequer billions of rupees. No wonder Circular Debt now is at its highest & is MORE than the Federation’s share of ALL Federal taxes
7. Petroleum Division said that PMLN bought long-term LNG at 13.37% of Brent whereas it is buying spot LNG at 10%.
Seriously? Is the Petroleum Division unaware of supply-demand influences on the price of a commodity like LNG; is it unaware of the price difference between
8. long-term LNG contracts as compared to one-off spot LNG prices in a temporarily depressed market; is it unaware of the energy security that long-term LNG supply provides. (75% of worldwide LNG is sold on long-term contracts).
Can the Division inform us how many spot
9.LNG cargoes have been procured against the shortage?
Is the Division unaware of the need of long term LNG contracts; is it unaware of the prices of LNG contracts of other countries; is it unaware that Pakistan has the cheapest long-term LNG contract in the world from the
10. world’s most reliable LNG supplier. Can the Division deny that ALL of Pakistan’s LNG contracts were substantially less than the market in the timeframe that they were signed? Why is a Division of the Government issuing misleading statements and trying to subvert the truth?
11. Earlier this year Brent & LNG were at their cheapest due to a collapse in demand driven by Covid 19. Short- & medium-term LNG contracts were available below $2.5 level. This was an opportunity for Pakistan to save billions of dollars; did PD capitalise on the opportunity? No.
12. The Petroleum Division was too busy importing Furnace Oil and Diesel for power plants and made no long-term contract. Why? Is this not a dereliction of its fiduciary duty? Public is smart enough to figure out why is it being done and who are benefitting from this policy.
13.Why did PD exacerbate the gas shortage by not importing sufficient quantity of LNG? Why did it not make a single short or medium-term LNG contract when the market was so low? Why has it not laid one inch of pipeline when we need at least one more 42’ south-north gas pipeline?
14. Petroleum Division talks about giving permission to LNG terminals without government guarantees. PMLN set up two terminals urgently with government guarantees which ensured the fastest provision of gas and the cheapest terminal costs. The Engro/SSGC/PSO terminal has always
15. run on full capacity. If the Division had procured more LNG instead of deferring or diverting LNG cargoes it could have run the PLTL/PGPL terminal on full capacity too, thus making any Govt guarantees superfluous. Is the PD aware that there is a shortage of gas in Pakistan?
16. The policy of merchant LNG terminals supplying gas to multiple buyers through third party access (TPA) rules without Govt guarantees was also made during the PMLN Govt and at least 3 major investors were in the process of setting up LNG terminals at Port Qasim.
17. TPA rules were also made during our tenure and consumers in Pakistan imported LNG directly. But the $5 million question remains: why hasn’t work started on any Merchant LNG terminal in 2 years?

The most intellectually dishonest and seriously laughable assertion made by the
18. Petroleum Division is that we supplied LNG to our new gas-fired power plants to produce more expensive power. Does the Petroleum Division know the cost difference between operating a 32% efficiency FO power plant and operating a 62% efficiency gas power plant?
19. The three 1200 MW govt-owned power plants that PMLN Govt put up are the world’s most efficient power plants and form the backbone of our baseload power generation. (Work was underway on the fourth). All the Petroleum Division has to do is to provide these power plants with
20. LNG instead of importing Diesel for unfathomable reasons or pandering to the Furnace Oil lobby.

Finally, there is nothing wrong with tweets by any of the phalanx of Government Ministers, Advisors, SAPM’s, and Spokespersons arguing against my contentions. I welcome a debate.
21. But to use the Energy Ministry or the Petroleum Division platforms for political and misleading tweets and statements is wrong. Is it ethical to force a Government Ministry or a Division to tweet against its own past decisions?
22. Ministers should tweet under their names & not involve the bureaucracy in their political machinations. LNG is NOT a 4 letter word; it is the only viable solution for Pak’s energy security, even if Nawaz Sharif and Shahid Abbasi were the ones to first bring it to Pakistan.

• • •

Missing some Tweet in this thread? You can try to force a refresh
 

Keep Current with Miftah Ismail

Miftah Ismail Profile picture

Stay in touch and get notified when new unrolls are available from this author!

Read all threads

This Thread may be Removed Anytime!

PDF

Twitter may remove this content at anytime! Save it as PDF for later use!

Try unrolling a thread yourself!

how to unroll video
  1. Follow @ThreadReaderApp to mention us!

  2. From a Twitter thread mention us with a keyword "unroll"
@threadreaderapp unroll

Practice here first or read more on our help page!

More from @MiftahIsmail

2 Oct
1. A 5 million dollar question is why is Ali Zaidi the Ports minister tweeting about LNG terminals which are the responsibility of the Petroleum ministry. Of course in character for PTI Ministers, his tweets are full of innuendoes & falsehoods.
Why this personal attack on me?
2. Because I recently said that the Ports Ministry is delaying grant of permission to companies at Port Qasim to set up LNG terminals by demanding both legal and illegal ‘compensation’. This is now common knowledge and a source of frustration for the Petroleum Ministry officials
3. and potential investors. In 2 years PTI has not been able to set up a single new LNG terminal and Pakistan is experiencing gas shortages that will only get worse.
Now to his accusations. He says the LNG terminals that the PMLN set up are some of the most expensive in the
Read 15 tweets
25 Sep
1. There is now considerable load shedding across Pakistan and particularly acute shortage of power and gas in Karachi. And gas shortage will only increase all over Pakistan as the winter approaches. Let’s see why this is happening. A little background first.
2. When PMLN came to power in 2013 Pakistan’s maximum power producing capacity was of 12,500 MWs. And we had piped local gas of about 3000 million cubic feet of gas per day (mmcfd). Over time gas production from fields depletes and our gas production was depleting too.
3. During our tenure we started gas production in 115 fields, a record, but almost all of these finds were small. We managed to keep supply in SSGC (1300 mmcfd) about the same but supplies decreased across the SNGPL network (from 1700 to 1300 mmcfd).
Read 15 tweets
28 Aug
1. Karachi has been ruled by PPP for the last 12 years, the first 5 of which were in coalition with MQM. Before that MQM ruled Karachi for 9 years. And in all this time Karachi has been deteriorating, so for MQM and PPP to try to evade responsibility is a bit rich.
2. Whether in violence, degradation of infrastructure, corruption in land transfers, water distribution, education etc, there isn’t one area where Karachi has kept pace with the rest of Pakistan much less the world. Yet politicians elected from and ruling Karachi aren’t bothered.
3. PPP has deprived Karachi of funds & has transferred authority to the province which should rightly belong to the city. But KMC still has residual authority & money and those aren’t being deployed effectively at all. MQM talks a good game but has never delivered for Karachi.
Read 10 tweets
18 Aug
PTI’s two year performance. Growth in national income decreased from 5.8% in 2018 to minus 0.4% in 2020. To make it more concrete, our per capita income has decreased from $1652 to $1388. Thus the average Pakistani has seen her standard of living decrease by 16% in 2 years. 1/14
Inflation rose from 3.9% in 2018 to 10.2% in 2020. Sugar, wheat flour, medicines, natural gas and electricity prices have nearly doubled. Taxes on petrol the highest ever. Food inflation is over 15%. This has caused untold misery to the poor and working people. 2/14
An additional 20 lakh people have been rendered unemployed in PTI’s two years. Over 80 lakh people have been pushed into abject poverty, and countless more have become food insecure. House rents and health care have become unaffordable for millions of working people. 3/14
Read 14 tweets
9 Aug
Thanks for asking what did PMLN do for Karachi. MNS (and SKA as PM) came to KHI many many times, more times than I can remember. It was MNS’s concern for KHI that he empowered the law enforcement agencies and brought peace to KHI, getting rid of bhatta 1/6
kidnapping for ransom and armed political wings. PMLN led by MNS built the green bus line, paid half cost (12.5 bil) for K4 water project, built power plants of 1320 MWs each at Port Qasim and Hub, started building K2 & K3 nuclear power plants, completed the Lyari expressway, 2/6
expanded and upgraded the KHI-Hyderabad motorway, created a National Industrial Park in Pak Steal, kept natural gas flowing in KHI when the rest of Pak had debilitating shortages, ensured continuous supply of power to KHI, doubled the money federation gives to Sindh, 3/6
Read 6 tweets
9 Aug
You’re absolutely right corruption awam ka masla hay. After PMLN held prices steady for five years, it is PTI’s corruption that resulted in medicine prices more than doubling, sugar price reaching Rs 95, wheat flour exceeding Rs 60, etc. ==>
And it’s PTI’s incompetence that: results in frequent rail accidents; has devastated our aviation industry and hurt PIA immensely; has increased losses of Public Sector enterprises; results in circular debt increasing at the rate of Rs 50 bil / month in spite of raising power ==>
tariffs repeatedly; that forces the govt to produce power using expensive deisel instead of LNG that it neglects to import; that forces huge load shedding in Karachi and rest of Pakistan, etc. Finally it is a combination of PTI’s corruption and incompetence that results in: ==>
Read 5 tweets

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3/month or $30/year) and get exclusive features!

Become Premium

Too expensive? Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal Become our Patreon

Thank you for your support!

Follow Us on Twitter!