• • •

Missing some Tweet in this thread? You can try to force a refresh
 

Keep Current with David Ndii

David Ndii Profile picture

Stay in touch and get notified when new unrolls are available from this author!

Read all threads

This Thread may be Removed Anytime!

PDF

Twitter may remove this content at anytime! Save it as PDF for later use!

Try unrolling a thread yourself!

how to unroll video
  1. Follow @ThreadReaderApp to mention us!

  2. From a Twitter thread mention us with a keyword "unroll"
@threadreaderapp unroll

Practice here first or read more on our help page!

More from @DavidNdii

20 Jan
Public Lecture on Economy that I gave 20 years ago, a situation uncannily similar to where we are today. Incredible how people repeat history.
Read 5 tweets
18 Jan
The hustler-dynasty debate is about oppressors vs oppressed. It is not about rich vs poor and no amount of diversionary scaremongering will make it so. A thread. 1/14
For 47 yrs a small clique of colonial nyapara has ring-fenced the state and accumulated more power and wealth than colonialists ever did. KCA sent Jomo Kenyatta to London to deliver a petition on land injustice. He bequeathed his family more land than any settler ever owned.
For decades, we have told this oligarchy that economic disenfranchisement of the majority is a time bomb, but as Upton Sinclair noted years ago, it is difficult to get a man to understand something when his salary depends on not understanding it.
Read 13 tweets
1 Oct 20
First, get your dates right. It was in the 50s. Second, objective of airlift was to educate successors for whites. It benefited 104 individuals, creme de la creme, the post independence who is who. The airlift was the foundation of the neocolonialism project. Here they are:
Read 7 tweets
29 Sep 20
HIGHWAY ROBBERY Long thread

As per project information memorandum (IM) dated 2016, the Government estimated cost of Nbi-Nku-Mau Summit at US$550m as shown. The contracted cost is reported at Sh180b ($1.7b) at current exchange rate. 1/13
The contracted cost of the 215km is reported at Sh180b ($1.7b), an eye popping Sh837m ($8m) per km, believe it or not, way more than the SGR ($6m/km). Dualling the 21km Athi River- Machakos Junction cost Sh5.3b, or Sh252m ($2.5m) per km.
This rate is similar to the per km cost of the $550m estimate in the project IM. Engineers and QSs need to educate us on why it is costing 3 times + as much to upgrade a similar road, more so when long stretches of the road are on flat open uninhabited terrain.
Read 12 tweets

Did Thread Reader help you today?

Support us! We are indie developers!


This site is made by just two indie developers on a laptop doing marketing, support and development! Read more about the story.

Become a Premium Member ($3/month or $30/year) and get exclusive features!

Become Premium

Too expensive? Make a small donation by buying us coffee ($5) or help with server cost ($10)

Donate via Paypal Become our Patreon

Thank you for your support!

Follow Us on Twitter!