(2/n)
GMR Power & Urban Infra Limited (GPUIL), holds expertise in the sectors of Energy, Urban Infrastructure & Transportation. Urbanization has given the country rapid growth and contributing towards this growth, GMR Group ventured into this business sector.
(3/n)
The division leverages on its collective experience and expertise in building successful projects across the country
(4/n)
🎯Co has reported a BIG Turnaround during Q1FY23
▪️Co has turned Profitable
▪️Reported PAT of 243cr vs loss of 226cr QoQ
▪️Q1 EPS of 3.52 vs (3.55) QoQ
▪️FY23EEPS of 13
▪️Gross Debt Reduced by 300cr during Q1
▪️Debt reduction & Debt restructuring in progress
(5/n)
▪️Trading at Forward P/E of just 2x
▪️Coming quarters can witness further improvement
ENERGY - PLF
▪️Warora: 94% vs 54% YoY
▪️Kamalanga: 81% vs 83% YoY
▪️Bajoli Holi: 50%
(6/n)
GMR Energy Ltd (GEL) - Financial Highlights
▪️Revenue at 1358cr vs 868cr (57% YoY)
▪️EBITDA at 547cr vs 235cr (+133% YoY)
▪️PAT at 248cr vs loss of 117cr
GMR Warora Energy Limited (GWEL)
▪️Debt resolution plan approved & adopted during Q1FY23
(7/n)
▪️798cr trade receivables & unbilled revenue, mgmt is confident of favorable outcome towards outstanding receivables
▪️Disputed capacity charges of 132cr awarded in favor of GWEL by CERC
▪️New PPA with GUVNL for the supply of 150 MW of power from October 2021 to July 2023
(8/n)
GMR Kamalanga Energy Limited (GKEL)
▪️1584cr trade receivables & unbilled revenue, management is confident of a favorable outcome towards the outstanding receivables
▪️The total outstanding receivable from Bihar Discoms amounts to 378cr
(9/n)
GMR Hyderabad Vijayawada Expressways Pvt Ltd (GHVEPL)
▪️Claim of 1672cr awarded to GHVEPL against NHAI by the arbitrator
▪️Arbitral Tribunal has been reconstituted & the hearing for procedural order has been fixed for August 24, 2022
(10/n)
GMR Chennai Outer Ring Road Pvt Ltd (GCORR)
▪️GCORR received an award of 340cr + interest against Government of Tamil Nadu (GoTN)
which was challenged in Madras HC
▪️HC upheld Tribunal Award & dismissed the challenge
▪️HC also awarded 9% p.a. interest on pre-award claim
(11/n)
Co operates in 4 distinct business segments
1️⃣Power
2️⃣Roads
3️⃣EPC
4️⃣Urban Infra
💎ENERGY SEGMENT
▪️GMR Energy is one of the largest diversified Infrastructure Conglomerates in India
(12/n)
▪️With operating capacity of over 4400 MW, it has a balanced fuel mix of coal, gas, LSHS as well as renewable sources of wind and solar energy.
▪️Plants of over 2300 MW generation capacity are under various stages of development in India & Nepal
(13/n)
▪️Portfolio diversity with mix of power sales contracts in short, medium & long term
▪️Operating coal property in Indonesia provides essential requirement of fuel security
▪️The co is moving from developing projects (Asset creation) to operating assets (Revenue generation)
(14/n)
Tenaga Nasional Berhad (Tenaga)
▪️Tenaga, the largest power utility player in Malaysia invested 30% equity in GMR Energy
▪️Tenaga with capacity of 10,818 MW & 50% market share, has significant experience in managing and operating power assets
(15/n)
▪️Tenaga’s experience would further facilitate GMR Energy in improving performance of its operational assets, develop it’s under development pipeline of hydro & renewable energy assets & drive future growth of the portfolio
(16/n)
➡️ENERGY ASSETS - COAL MINE
1️⃣PT Golden Energy Mines Tbk (PT GEMS)
▪️Co holds 30% equity stake in PT Golden Energy Mines Tbk (PT GEMS) through its subsidiary
▪️PTGEMS is part of Sinar Mas group, one of the largest business conglomerate in Indonesia
(17/n)
▪️PT GEMS is engaged in the exploration, mining & marketing of thermal coal from its coal mining concession areas in Indonesia
▪️Co Stake in PT GEMS is currently valued at ~6250cr vs mkt cap of ~1600cr
▪️Potential resource of 2.91 bn tons & total reserves of 1.03 bn tons
(18/n)
▪️In FY22, GMR Power has received dividend from PT GEMS amounting to 843cr
▪️During CY21, PT GEMS recorded realisation of coal production of 29 mn tons, whereas the sales volume was 29.5 mn tons
▪️Significant Improvement in coal prices have resulted in better profitability
(19/n)
▪️Realisations were up 2.7x YoY to USD 79.8/ton in Q4FY22 from USD 29.7/ton in Q4FY21 due to increase in coal prices
▪️EBITDA per ton increased from USD 5.0/ton to USD 30.7/ton in Q4FY22 due to higher realization
▪️PT GEMS aims to achieve production of 40 mn tons in CY23
(20/n)
➡️ENERGY ASSETS - GREEN ENERGY
1️⃣Wind Energy
▪️2.10 MW plant located in Moti Sindhodi Village, Kutch District, Gujarat. 25-year PPA has been signed with GUVNL with respect to the entire power generated from the Plant
(21/n)
▪️1.25 MW plant is located in Tirupur District, Tamil Nadu. 20-year PPA was signed with TANGEDCO with respect to the entire power generated from the Plant
2️⃣Hydro Energy
▪️GMR Bajoli Holi. 180 MW run-of-the-river power Project successfully commissioned on March 28, 2022
(22/n)
▪️GMR Upper Karnali Hydropower Ltd in Nepal is Prestigious 900 MW project is under advanced stage of development. Export oriented project with power to be supplied to India & Bangladesh
▪️GMR Londa Hydropower, a 225 MW project in East Kameng district in Arunachal Pradesh
(23/n)
▪️GMR Badrinath Hydro Power Generation Private Ltd is developing a 300 MW Alaknanda HEP on Alaknanda River in Uttarakhand
3️⃣Solar Energy
▪️GMR Gujarat Solar Power Pvt Ltd in Patan is one of the first 25 MW single Solar Project installed in India. PPA with GUVNL for 25 Yrs
(24/n)
▪️GMR Rajam, 1 MW solar power plant located in Rajam, Andhra Pradesh
➡️ENERGY ASSETS - COAL
1️⃣GMR Warora Energy Ltd, India
▪️600 MW coal based power plant located in Chandrapur, Maharashtra
▪️Long term PPA for 200 MW each with DNHPDCL, MSEDCL & 150MW with TANGEDCO
(25/n)
2️⃣GMR Kamalanga Energy Ltd, India
▪️1050 MW power plant located in Dhenkanal district, Orissa is strategically located close to the coal belt
▪️15% untied capacity to take advantage of the merchant market
▪️Long Term PPA with GRIDCO, UHBVNL & Bihar State Electricity Board
(26/n)
➡️ENERGY ASSETS - GAS
1️⃣GMR Vemagiri Power Generation Ltd
▪️388 MW GE-9F Gas based power plant in Rajahmundary, AP
▪️Being India’s most cost-effective independent power producer, this plan is NG/RLNG fired combined cycle power plant fitted with advanced gas turbines frm GE
(27/n)
2️⃣GMR Rajahmundry Energy Ltd
▪️768 MW combined cycle power plant with Natural gas and group’s largest gas based power plant
▪️Equipped with an advance Gas Turbine Technology from GE
▪️Located close to Krishna Godavari gas basin
(28/n)
💎TRANSPORTATION SEGMENT
▪️Mixed portfolio of Annuity & Toll Projects
▪️Surface transport projects includes Roads, Railways, Metros & Airstrips/ Runways in both DBFOT (under GMR Highways) and EPC (under GIL – EPC) segments
(29/n)
▪️4 operating assets with total length of over 1824 Lane kms of Roads & Highways
▪️Railway projects worth 4000cr
1️⃣GMR Pochanpalli Expressways Ltd
▪️412 Lane Km on BOT Annuity based for 20 years project on NH-7, Andhra Pradesh
(30/n)
▪️Built to world-class standards, four-laning of this road has eased traffic congestion & provided a tremendous boost to trade & commerce in the region
2️⃣GMR Chennai Outer Ring Road Pvt Ltd
▪️178 Lane kms on DBFOT Annuity based for 20 yrs, Groups 1st state highway project
(31/n)
▪️The project links NH 45, NH 4 and NH 205 outside the city
3️⃣GMR Ambala Chandigarh Expressways Pvt Ltd
▪️The Ambala - Chandigarh project on NH-21 & 22, Haryana & Punjab 140 Lane Km on BOT Toll based for 20 years is the Group’s first highway project in North India
(32/n)
▪️The Ambala - Chandigarh stretch has one of the highest traffic densities in country, catering to vehicular traffic between Punjab, Haryana, Himachal Pradesh & New Delhi
▪️There is a 12-lane state of the art toll plaza for toll collection with facility for Electronic Toll
(33/n)
4️⃣GMR Hyderabad Vijayawada Expressways Pvt Ltd
▪️GMR Infrastructure Limited led consortium has won the Hyderabad – Vijayawada highway project on a Build, Operate and Transfer (Toll) basis through an international competitive bidding route
(34/n)
💎EPC SEGMENT
▪️Provides turnkey EPC solutions across multiple business sectors like Airports, Energy, Highways, Railways and Urban Infrastructure
▪️The division has delivered several critical projects across the Group and is powered by a highly experienced workforce
(35/n)
1️⃣Highways
▪️Ambala - Chandigarh on NH-22,21, Haryana, Punjab
▪️Adloor - Gundla Pochanpalli on NH-7, Andhra Pradesh
▪️Chennai Outer Ring Road (CORR) on Chennai, Tamil Nadu
▪️Hyderabad - Vijayawada on NH-9, Andhra Pradesh
▪️Hungund - Hospet on NH-13, Karnataka
(36/n)
▪️Tindivanam - Ulundurpet on NH-45, Tamil Nadu
▪️Thondapalli - Jadcherla on NH-7, Andhra Pradesh
(37/n)
2️⃣Buildings & Energy
▪️Kamalanga Thermal Power Plant, Odisha
▪️GMR Warora Energy Power Plant, Maharashtra - Coal Handling plant
▪️GMR Varalakshmi DAV School
▪️GMRVF Care Hospital, AP - 130 bed Hospital
▪️TATA Myst Project, HP - Construction of Row houses & Villas
(38/n)
3️⃣Railways
▪️RVNL’s Jhansi - Bhimsen Project, Uttar Pradesh
▪️RVNL’s Multi Modal Transport System (MMTS) Ph – II Corridors in three packages
▪️DFCC’s Package 201, 202, Uttar Pradesh
▪️DFCC Package 301, 302
(39/n)
💎URBAN INFRA SEGMENT
▪️Building state of the art, multi-product industrial projects in Tamil Nadu
▪️Currently developing a 2101Ac (850 Ha) multi-product Special Investment Region (SIR) at Krishnagiri, Tamil Nadu
(40/n)
💡WHAT'S IN STORE FOR FUTURE ?
▪️Continued focus on deleveraging via divestments/ equity capital transaction with marquee partners
▪️In order to reduce its debt further, co is planning to partial stake sale in PT GEMS to raise up to $400 million
(41/n)
▪️Co plans to reduce Debt significantly
▪️Positioning EPC Business to become a key player in the Railway Sector
▪️Co has a Proven track record of developing and operating a diversified portfolio of infrastructure projects with relatively stable & long term income streams
(42/n)
▪️Debt resolution for GMR Warora Energy Ltd approved and adopted
▪️Confirmed linkage from Coal India Ltd. for entire contracted capacity already in place
• • •
Missing some Tweet in this thread? You can try to
force a refresh
▫️SPML Infra Limited is a leading Infrastructure Development company with over 40 years experience in the public as well as private sector.
(3/n)
▫️Co undertakes tender based contract from government departments & has a pan-India presence with ongoing projects at Delhi, Uttar Pradesh, Rajasthan, Bihar, Gujarat, Maharashtra & Karnataka.
(2/n)
JSWISPL is engaged in manufacturing and marketing of sponge iron, steel & ferro alloys, billets & pellets
Co has upgraded its production process from commodity steel to special steel products catering to needs of seamless pipe industries, automobile & high-speed rail steel
(3/n)
In August 2018, a joint consortium of AION Investments Private II Ltd. (AION) & JSW Steel Limited acquired controlling stake in JSW Ispat Special Products Ltd
(2/n)
KP Energy provides complete solutions from concept till completion of project lifecycle of Wind Project
Co provides complete turnkey solutions including on BOT basis for wind energy clients which includes all the processes from Site Identification to Capacity Installation
(3/n)
Business model of company is designed to bring scalability in wind sector by serving OEM (Original Equipment Manufacturers) of Wind Turbines, IPPs (Independent Power Producers), Captive Users as well as Institutional Investment Programmes
(1/n)
BCL Industries Ltd - The Big Ethanol Story
ROE ~18%
ROCE ~17%
Promoter Holding - 61.4%
A detailed 🧵on the Big Ethanol Play
Do Share/Retweet to educate more Investors
(2/n)
BCL Industries is a diversified business house with business interest spread across the variety of industries namely Edible Oil & Vanaspati, Distilleries & Real Estate
One of the largest edible oil manufacturers in North India having a capacity 1,020 tons per day
(3/n)
BCL is one of the largest edible oil complex in North India. It has integrated edible oil plant with ability to conduct processing of oilseeds as well as packaging 8 brands of refined edible oil
BCL is also one of the largest grain-based Ethanol manufacturers in the country
(2/n) Strong Fundamentals
Mkt cap - 1745cr
Book Value - 1460
P/E ~2.6x (Annualized Basis)
P/B ~1.3x
ROCE ~21%
ROE ~17%
Promoter Holding - 73.2%
Asset-light, high ROCE
High OPM, high operating-leverage
Yielding good Cash Flow from Operations
(3/n) Reported Back to Back Best Ever Quarterly Performance in History of the Co
500cr Cash in hand (~0.3x current Mkt Cap)
During FY21 Operational turnaround of Ferroalloys was completed with the Coke Oven & WHR Boiler plant fully commissioned
Dynamic Cables ~ A Multibagger in the making?
CMP - 62
Mkt Cap - 136cr
Promoter holding - 74%
Read the detailed thread below
(1/9) Co has delivered very good operational performance during past 2 quarters
Q4FY21 PAT of 5.34cr with an EPS of 2.43
Q1FY22 PAT of 5.47cr with an EPS of 2.48
Since its IPO in late 2017, co has shown tremendous growth and further strengthened their Balance Sheet
(2/9) Co targeting 1100cr topline by 2025. FY21 Revenues was 343cr i.e. 3x Revenue tgt in 4 yrs
Co aims to achieve DEBT FREE status by 2025
Co aims to increase its Exports to 40% from current 15%
Co aims to achieve a mkt cap of 1000cr by 2025 i.e. 7.5x in just 4 years