1. Oyo Governor Abiola Ajimobi has approved C of O for the planned Inland Dry Port in Ibadan.
2. The new #LagosIbadanRail has now passed Kilometer 137 (somewhere in Omi Adio, on the outskirts of Ibadan). Will terminate at KM 158, which will be the Ibadan Dry Port.
The 6 ‘smaller’ Stations on #LagosIbadanRail should be ready by July 2019.
The 4 ‘Mega’ Stations: Apapa, Ebute Metta, Abeokuta and Ibadan will take longer to complete.
Complete #LagosIbadanRail
Extend Central Line from Itakpe to Abuja (with spur to Lokoja)
Commence #CoastalRail (#LagosCalabarRail), starting w/ PH to Warri (to join the Central Line at Warri) and Benin to Onitsha (to join Central Line at Agbor)