That roads are public goods does not mean financing their construction from taxes is possible or even optimal.
cc: @StearsBusiness
So the average cost per road in each geopolitical zone and nationally is as follows:
NE - ₦239 million / km
NW - ₦219 million / km
SE - ₦242 million / km
SS - ₦413 million / km
SW - ₦329 million / km
National -₦225 million / km
1 - Roads are bloody expensive.
2 - Roads in the SS are the most expensive (swampy terrain ??).
A1 (+E1) = 1221 km
A2 = 1057 km
A3 = 1513 km
A4 = 1146 km
Very straightforward.
That's 1.1 trillion Naira.
Then funding from the budget & the soon-to-be-introduced tax on PMS can fund other roads.
NOT as discrete connections between two towns (e.g. Lagos - Ibadan, Abuja - Kaduna, etc).
OK. That's all for now.
THE END.