Requiremts
1. Must be a LA1A 1 user consuming 500+ units in a billing cycle
2. 150 sq ft shadow free roof area
3. AADHAAR, Tangedco card.
The list of empaneled vendors is alos there,talk to few of them baseed on your locality check if they can do the work.
Some of them may want to visit the site to check feasibility.
2/n
You can choose the vendor or ask the TEDA to choose the vendor.
You can give 2 choices
If your application is accepted then you will get an allotment order. Print this and keep.
Then the vendor will supply his equipment and do the installation.
4/n
You endorse it, and also make a request to TANGEDCO for new meter.
You have to pay your share to the vendor before installation by NEFT/Cheque.
5/n
They will take the last reading from old meter and install new reverse meter.
Your line is now connected to grid.
6/6
End of thread.
Now the AE will inspect the solar/inverter connections and then send a quote for new meter to EE, who will then release it.
We have to pay for the new meter separately 6K+GST.
@CMOTamilNadu