24/7 production
3 shifts of 2828 personnel
326 material trucks + 4 full trains a day
137 outgoing car transporters + 2 full trains a day

- There will be one 1.5MW process heat boiler in the construction building, 2 1.5MW and 3 5MW boilers in the central utilities building (in GF3 the building on the farside)
+ noise emission point sources

Translations:
Height | Width | Length | unknown | chimney-height over building-top | chimney height over ground
Main Building
Central Utilities Building

Moderate burden during construction phase.
A horse riding round path will be interrupted ;-)
LOW burden matching matching all rules, regulations and laws on:
- air emissions
- sound emissions
- odor emissions

- high impact due to pine-monoculture-removal and soil sealing
- medium impact due to construction sound and area usage
- low impact due to:
- air / odor emissions and in potential cases of production interruption


Moderate impact during construction
LOW expected impact due to:
- air-pollution
- waste
- ground water hazards
- potential production interruptions (fire, etc.)
- potential deconstruction

Moderate impact during construction; LOW afterwards..
Yes guys, Germans like looooong documents