Year : 1947
Recommendation of Modak - Mayer study : Build an underground railway in Mumbai.
Post War Development Committee recommended building a city opposite South Mumbai on Mainland.
Barve Committee recommended setting up a new business complex at Bandra Kurla
An Andheri Trombay line was in existence. Shut down for airport.
Then we had to grapple with metro 70 yrs later.
Trans harbour link proposed in same Wilbur Smith report.
We still have not built it
A six lane road on alignment of Jogeshwari Vikhroli Link road proposed.
All these Wilbur Smith suggestions were supposed to be complete by 1981. Thus giving Mumbai horizontal growth with centres at Uran and BKC. Not the N-S nightmare of today.